FIELD: mining industry. SUBSTANCE: this is used for stabilizing rock mass with anchor support. Steel stem of anchor having locking member located on its tail end and binding material for imbedding stem in bore-hole is additionally provided with second locking member located at head end of stem. Distance between locking members is less than length of bore-hole. Binding material is made of sand-cement slurry and nonexplosive destruction material. EFFECT: high efficiency. 1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR FILLING IN DESCENDING EXTRACTION OF MINERAL BY STOPES | 1994 |
|
RU2069765C1 |
METHOD FOR CONSTRUCTION OF ISOLATION CONNECTION | 1994 |
|
RU2069766C1 |
METHOD OF EXPLOSIVE BREAKING OF BROKEN-UP ROCK MASS AT BREAKING ONTO BASSET | 1995 |
|
RU2101673C1 |
METHOD FOR MINING STEEPLY-DIPPING ELONGATED DEPOSITS | 1995 |
|
RU2097561C1 |
METHOD FOR FORMATION AND MINING OF TECHNOGENIC DEPOSIT | 1994 |
|
RU2096615C1 |
ROOF BOLT LOCKED BY FIRING | 2010 |
|
RU2451182C1 |
METHOD FOR FORMATION AND DEVELOPMENT OF TECHNOGENIC UNDERGROUND DEPOSIT | 1995 |
|
RU2102599C1 |
LABORATORY MILL-CLASSIFIER | 1994 |
|
RU2079367C1 |
SUBSTRATE FOR PLANT CULTURING IN PROTECTED SOIL | 1995 |
|
RU2115300C1 |
PILE | 1996 |
|
RU2109107C1 |
Authors
Dates
1997-06-10—Published
1994-07-28—Filed