FIELD: construction engineering. SUBSTANCE: this can be used in foundations of buildings and structures erected on permafrost ground. Pile is constructed in bore-hole filled with freezing liquid compound and it is made up of barrel and anchor members. Anchor members are connected by flexible links to each other and to end of pile. Flexible links can be embodied in the form of cylindrical shell. Barrel can be made in the form of pipe with bottom elevated above ground surface and filled with cooling agent. EFFECT: higher efficiency. 2 cl, 2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR ERECTION OF ICE PLATFORM ON GROUND | 1995 |
|
RU2080440C1 |
POLE FOR OVERHEAD SYSTEM TO BE ERECTED IN HEAVING GROUND | 2006 |
|
RU2317375C2 |
UNDERGROUND REFRIGERATOR | 1995 |
|
RU2129190C1 |
CATENARY LINE SUPPORT ON SLOPE AND DECLIVITY ERECTED ON HEAVING SOILS | 2018 |
|
RU2697755C1 |
METHOD OF TREATING WOODEN PILE BASE WITH ANTI-HEAVING COATING | 2023 |
|
RU2826072C1 |
METHOD OF PURIFYING WATER POOL SURFACE FROM OIL SPOT | 1995 |
|
RU2078051C1 |
LOW-RISE ENERGY-PRODUCING BUILDING | 2012 |
|
RU2526031C2 |
METHOD FOR CONSTRUCTION OF ANCHOR PILES | 1996 |
|
RU2114250C1 |
WOODEN PILE BASE WITH COATING FOR INSTALLATION IN HEAVING SOILS | 2023 |
|
RU2822185C1 |
PILE | 1996 |
|
RU2117097C1 |
Authors
Dates
1998-04-20—Published
1996-01-31—Filed