FIELD: construction engineering. SUBSTANCE: according to method, holes are made in roofing inclined towards outer part of building over its perimeter at distance not exceeding 30 cm from inner side of outer wall. These holes are connected by pipeline with sewerage system. Spacings between holes in roofing with nonorganized water drainage is 6-12 m. In roofing with organized water drainage holes are made in zone of draining devices. EFFECT: high efficiency.
Title | Year | Author | Number |
---|---|---|---|
ANTI-ICING ROOFING OF SLOPING OR CONDITIONALLY FLAT ROOFS, RECONSTRUCTION METHOD FOR EXISTENT OUTER ORGANIZED WATER DRAINAGE SYSTEM, WHICH DRAINS WATER, PREFERABLY WATER FROM MELTED SNOW, FROM INCLINED METAL ROOFING, AND ANTI-ICING WALL GUTTER FOR ABOVE RECONSTRUCTION REALIZATION | 2005 |
|
RU2301869C2 |
METHOD TO DRAIN WATER FROM MELTED SNOW AND RAIN WATER FROM THE OUTSIDE OF INCLINED ROOF | 2005 |
|
RU2299956C2 |
EXTERNAL DRAINAGE SYSTEM FROM THE ROOFING OF THE BUILDING | 2015 |
|
RU2667559C2 |
METHOD OF BUILDING ROOF COLLECTING SYSTEMS PROTECTION AGAINST ICING | 2009 |
|
RU2439260C2 |
GARRET ROOF | 0 |
|
SU1700175A1 |
HEATED RAINWATER GUTTER HEAD | 2006 |
|
RU2305734C1 |
BUILDING WITH PITCHED ROOF HAVING DEVICE FOR PREVENTION OF FORMATION OF ICICLES, ICE CRUST AND SNOW CORNICES ON ROOF | 2011 |
|
RU2481443C1 |
ARRANGEMENT OF BUILDING AND STRUCTURE ROOF | 2012 |
|
RU2494199C1 |
WATER DUCT FOR ROOF OF BUILDINGS WITH A CORNICE | 0 |
|
SU798259A1 |
METHOD OF PROTECTION OF DRAINAGE ROOF ELEMENT SURFACE OF BUILDING ROOF AGAINST ICING | 2016 |
|
RU2658712C2 |
Authors
Dates
1997-06-20—Published
1994-09-22—Filed