FIELD: construction and repair of rail track. SUBSTANCE: machine has two frames interconnected by a detachable joint and bearing against carriages, control cab, installed on end sections of machine, padding units installed on both frames, and a lifting-aligning gear and branch track lifting devices arranged on the first frame in the direction of machine operation installed for rearrangement in height and movement in lateral direction by means of the respective drives. The control cab located before or past the padding unit is installed on the first frame in the direction of machine operation. The first frame is longer than the second frame is installed for movement by drives across the machine. EFFECT: facilitated procedure. 8 cl, 4 dwg
Title | Year | Author | Number |
---|---|---|---|
TRACK-PACKING MACHINE FOR SWITCHES AND RAILROAD CROSSINGS | 1993 |
|
RU2062858C1 |
BALLAST TAMPING MACHINE | 1996 |
|
RU2110635C1 |
METHOD AND TIE TAMPER FOR COMPACTING RAILWAY TRACK RUBBLE | 1992 |
|
RU2048630C1 |
MOBILE MACHINE FOR SPORT SURFACING OF TRACK, TAMPING AND FINISHING | 0 |
|
SU1804521A3 |
TIE TAMPER, ITS ARRANGEMENT AND METHOD OF TIE TAMPING | 1996 |
|
RU2124088C1 |
SLEEPER TAMPING AND NIPPING MACHINE | 1988 |
|
RU2013483C1 |
RAILWAY TRACK STRAIGHTENING MACHINE | 0 |
|
SU1540658A3 |
MOVABLE MACHINE FOR STRAIGHTENING RAILWAY TRACK IN PLANE AND PROFILE OF SWITCHES | 0 |
|
SU1660585A3 |
TRACK LINER | 1994 |
|
RU2097471C1 |
DEVICE FOR RAMMING SLEEPERS AND STRAIGHTENING TRACK FOR TRACK LINER WITH FRAME MOUNTED ON RUNNING TRUCKS | 0 |
|
SU1279537A3 |
Authors
Dates
1997-06-27—Published
1994-01-26—Filed