FIELD: mining; preparation of coal mass for mining. SUBSTANCE: method includes drilling hole in coal seam into treated zone, supply of carbon dioxide at pressure not below the threshold value. Distinguishing feature of the technical solution of version one is the fact, that pressure in hole exceeds the threshold value, but is less than seam hydraulic fracturing pressure, by means of injection of water into holes up to full saturation of treated zone. Then water pressure is increased in holes up to hydraulic fracturing of seam, and water is injected until pressure in hole is less than threshold one. According to the other version, after complete water saturation of treated zone and increase of pressure in holes up to hydraulic fracturing of seam, injection of water is periodically discontinued, and injected again up to maximum attained pressure of hydraulic fracturing until it becomes below the threshold value. EFFECT: higher efficiency. 2 cl
Title | Year | Author | Number |
---|---|---|---|
COAL PROCESSING METHOD | 1998 |
|
RU2139426C1 |
COMBINED METHOD OF LOOSENING COAL MASSIF AND FACILITY FOR IMPLEMENTATION OF THIS METHOD | 2007 |
|
RU2342531C1 |
METHOD FOR DEVELOPMENT OF OIL DEPOSIT | 1998 |
|
RU2123581C1 |
METHOD FOR HYDRAULIC FRACTURING OF OIL BED | 1998 |
|
RU2123587C1 |
METHOD FOR DEGASSING OF COAL SEAMS | 1996 |
|
RU2117764C1 |
DEVICE FOR SEALING OF BORE-HOLE | 1996 |
|
RU2105153C1 |
METHOD OF THERMOHYDRODYNAMIC STIMULATION OF GAS- BEARING BED | 2001 |
|
RU2205272C2 |
METHOD OF STIMULATION OF COAL BED THROUGH WELLS DRILLED FROM EXCAVATIONS | 2013 |
|
RU2547873C1 |
OIL AND GAS, SHALE AND COAL DEPOSIT DEVELOPMENT METHOD | 2012 |
|
RU2518581C2 |
METHOD FOR STRESS RELIEF OF ROCK MASS | 0 |
|
SU1804556A3 |
Authors
Dates
1997-06-27—Published
1995-07-28—Filed