FIELD: oil production industry. SUBSTANCE: this relates to increasing oil recovery coefficient due to more uniform displacement of oil by agent. According to method, horizontal wells are drilled in productive thickness of oil bed so that distance from flooding source to horizontal well at its each point is inversely proportional to oil reserve in given zone and directly proportional to conductivity of oil beds. In case of multiple-bed deposit or large thickness, horizontal well is driven in the form of several loops, and aforesaid relationship is maintained in each loop. EFFECT: high efficiency. 1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR DEVELOPMENT OF HETEROGENEOUS MULTILAYER OIL FIELD | 1991 |
|
RU2024740C1 |
METHOD FOR EXPLOITATION OF OIL DEPOSIT OF COMPLEX STRUCTURE IN LATE STAGE | 1993 |
|
RU2077663C1 |
PROCESS OF EXPLOITATION OF MULTIPOOL OIL DEPOSIT | 1993 |
|
RU2057913C1 |
METHOD OF DEVELOPMENT OF OIL POOL HAVING RESERVOIR PITCHING-OUT ZONES | 1994 |
|
RU2090743C1 |
METHOD FOR DEVELOPMENT OF NONUNIFORM OIL DEPOSIT | 1996 |
|
RU2101475C1 |
METHOD FOR FLOODING OIL DEPOSIT | 1994 |
|
RU2072032C1 |
METHOD FOR DEVELOPMENT OF OIL MULTILAYER FIELD | 1989 |
|
RU1653403C |
METHOD OF DEVELOPMENT OF OIL DEPOSIT | 1999 |
|
RU2172395C2 |
METHOD FOR DEVELOPMENT OF OIL DEPOSITS NONUNIFORM ABOUT RESERVOIR PROPERTIES IN DIFFERENT ZONES | 1993 |
|
RU2046181C1 |
METHOD FOR EXPLORATION OF MULTI-SEAM OIL DEPOSIT WITH RESERVOIRS OF DIFFERENT STRUCTURE TYPE | 1993 |
|
RU2072031C1 |
Authors
Dates
1997-07-27—Published
1994-04-12—Filed