FIELD: oil production. SUBSTANCE: process provides for drilling-out of deposit by system of vertical injection and horizontal production wells with selection of their trajectory and opening of all pool of multipool oil deposit, driving of oil with working agent and extraction of products. Selection of trajectory of horizontal wells is carried out by connection of points positioned over uniform grids inter matched in plane which number is equal to number of used pools. Start of horizontal shaft in row of wells bordering on rows of injection wells is placed at distance bigger than distance from its finish to injection well. Center and finish of horizontal shaft is arranged at equal distances from injection well. As extracted products are flooded sections of well shafts are disconnected by pumping of polymer solution in calculated volume beforehand and of plugging material later. EFFECT: improved operational efficiency of process. 1 dwg, 1 tbl
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR DEVELOPMENT OF OIL DEPOSIT MADE UP OF NONUNIFORM RESERVOIRS | 1994 |
|
RU2085723C1 |
METHOD FOR DEVELOPMENT OF HETEROGENEOUS MULTILAYER OIL FIELD | 1991 |
|
RU2024740C1 |
METHOD FOR DEVELOPMENT OF NONUNIFORM OIL DEPOSIT | 1996 |
|
RU2101475C1 |
METHOD OF DEVELOPING OIL DEPOSIT IN CARBONATE RESERVOIRS OF FISSURED TYPE | 1996 |
|
RU2101474C1 |
METHOD OF DEVELOPMENT OF OIL DEPOSIT | 1999 |
|
RU2172395C2 |
METHOD FOR DEVELOPMENT OF MASSIVE-TYPE DEPOSIT | 1995 |
|
RU2095551C1 |
METHOD OF DEVELOPMENT OF NONUNIFORM-HORIZON OIL DEPOSIT | 1999 |
|
RU2172396C2 |
METHOD FOR EXPLORATION OF MULTI-SEAM OIL DEPOSIT WITH RESERVOIRS OF DIFFERENT STRUCTURE TYPE | 1993 |
|
RU2072031C1 |
METHOD FOR DEVELOPMENT OF OIL MULTILAYER FIELD | 1989 |
|
RU1653403C |
METHOD FOR DEVELOPING OIL DEPOSITING CARBONATE COLLECTORS OF FISSURE-CAVITY TYPE | 1992 |
|
RU2073791C1 |
Authors
Dates
1996-04-10—Published
1993-08-06—Filed