FIELD: mining industry. SUBSTANCE: according to method, sectional development workings are driven and seams are worked in by long stoping faces, recesses are made in sides of workings, recesses are filled with rock or quick-hardening material. Width of side recesses is taken as equal to depth of extension, around development workings, of zones with excess fissuring of rocks in immediate roof in periods of supporting them at boundary with worked-out space. EFFECT: high efficiency. 3 cl, 2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF MINING OF MINERAL BEDS AT LARGE DEPTHS | 1994 |
|
RU2091582C1 |
EXCAVATION METHOD OF THICK FORMATIONS OF MINERAL RESOURCES | 2006 |
|
RU2327036C2 |
METHOD FOR SAVING SECTIONS OF DEVELOPMENT WORKINGS | 1998 |
|
RU2134786C1 |
METHOD OF MINING OF THICK MINERAL BEDS | 2000 |
|
RU2186976C2 |
LAYER EXCAVATION METHOD OF MINERAL RESOURCES | 2006 |
|
RU2327035C2 |
METHOD OF MINING OF THICK MINERAL BEDS | 2000 |
|
RU2186975C2 |
METHOD OF MINING OF THICK MINERAL BEDS | 2001 |
|
RU2206741C2 |
METHOD OF PILLAR-FREE MINING OF THIN AND MEDIUM-THICK MINERAL BEDS AT GREAT DEPTHS | 0 |
|
SU1346791A1 |
METHOD OF MINING OF MINERAL BEDS AT LARGE DEPTHS | 1993 |
|
RU2111358C1 |
UNDERGROUND MINING METHOD IN AREAS HAVING LIMITED DIMENSIONS | 2005 |
|
RU2282720C1 |
Authors
Dates
1997-07-27—Published
1994-02-14—Filed