FIELD: bridge-building industry. SUBSTANCE: method implies movement by floating of pontoon-carried bridge structure to place of setting, installation of bridge structure onto supports by immersing it by way of filling its ballast compartments with water. Prior to that, assembled pontoon-carried bridge structure is position afloat in waiting chamber located along ground surface roadway and connected to water flow bed. Before start of moving pontoon-carried bridge structure to bridge setting place, it is brought for its entire length into water flow bed. At place of bridge setting, after alignment of bridge structure axis with axis of ground surface roadway, bridge structure is fixed to shore abutments made in line with ground surface roadway, then pontoon-carried bridge structure is installed on supports made in shore abutments. EFFECT: high efficiency. 6 dwg
Title | Year | Author | Number |
---|---|---|---|
PEDESTRIAN BRIDGE | 2019 |
|
RU2702676C1 |
PONTOON-BRIDGE PARK UNIT | 1982 |
|
RU2068908C1 |
FLOATING RAILWAY BRIDGE | 2000 |
|
RU2158331C1 |
METHOD OF BANK COMPENSATION FOR INVENTORY SURFACING RAILWAY BRIDGE AT HIGH SPEED OF RIVER FLOW | 2020 |
|
RU2739543C1 |
METHOD FOR COMPENSATING FOR TEMPERATURE CHANGES IN THE LENGTH OF THE NzHm-56 FLOATING RAILWAY BRIDGE DURING THE WITHDRAWAL AND INPUT OF THE OUTLET FERRY DURING THE PASSING THROUGH OF SHIPS | 2020 |
|
RU2745580C1 |
METHOD OF RECONSTRUCTION OF BRIDGEWORK WITH DISPLACEMENT OF RAILWAY BRIDGE FRAMEWORK AFLOAT AND ERECTION OF PEDESTRIAN BRIDGE | 2000 |
|
RU2198978C2 |
METHOD FOR RECONSTRUCTION OF OVERPASS WITH DISPLACEMENT OF RECONSTRUCTED RAILWAY BRIDGE AFLOAT | 1999 |
|
RU2152477C1 |
METHOD FOR ERECTION OF PEDESTRIAN OVERPASS | 1999 |
|
RU2152475C1 |
FERRY-BRIDGE CARRIER | 1987 |
|
RU2069247C1 |
PONTOON BRIDGE | 2012 |
|
RU2507337C2 |
Authors
Dates
1997-08-10—Published
1995-03-03—Filed