FIELD: geophysical examinations of inclined and horizontal boreholes with the aid of instruments on cable. SUBSTANCE: additional lay of armor in two layers in opposite directions with clearance between wires is wound on quantity-produced geophysical cable. Both layers are potted with plastic material, for example, polyethylene, Such design of cable increases its rigidly for pushing of geophysical instrument through horizontal sections of borehole with simultaneous maintenance of flexibility need for cable winding on drum of hoist. EFFECT: enhanced functional reliability pf geophysical cable. 2 cl, 2 dwg
Title | Year | Author | Number |
---|---|---|---|
GEOPHYSICAL CABLE TO EXAMINE INCLINED AND HORIZONTAL HOLES AND METHOD OF EXAMINATION OF THESE HOLES | 1997 |
|
RU2105326C1 |
GEOPHYSICAL CABLE ( VARIANTS ) AND METHOD OF INVESTIGATION OF WELLS | 1998 |
|
RU2138834C1 |
METHOD OF DELIVERY GEOPHYSICAL INSTRUMENTS INTO HORIZONTAL WELLS BY CABLE | 1998 |
|
RU2138613C1 |
LOAD-CARRYING LOGGING CABLE ( VARIANTS ) AND PROCESS OF INVESTIGATION OF INCLINED AND HORIZONTAL WELLS | 2002 |
|
RU2209450C1 |
GEOPHYSICAL CABLE (OPTIONS) AND THE WELLS RESEARCH METHODS | 2017 |
|
RU2696363C2 |
METHOD OF PERFORATION OF PRODUCING FORMATIONS IN OIL AND GAS WELLS UNDER DRAWDOWN | 1999 |
|
RU2171367C2 |
DEVICE AND METHOD OF WELL HYDRODYNAMIC INVESTIGATIONS AND TESTS | 2001 |
|
RU2199009C2 |
METHOD AND DEVICE FOR GAS-HYDRODYNAMIC FRACTURING OF PRODUCTIVE FORMATIONS FOR DEVELOPMENT OF PROBLEMATIC RESERVES (VARIANTS) | 2010 |
|
RU2442887C1 |
GEAR AND TECHNOLOGY OF REPEAT OPENING OF PRODUCTIVE POOLS | 2000 |
|
RU2183259C2 |
DEVICE AND METHOD FOR THERMAL GAS-HYDRODYNAMIC OIL AND GAS FORMATION FRACTURE (VERSIONS) | 2012 |
|
RU2493352C1 |
Authors
Dates
1997-08-20—Published
1996-03-12—Filed