FIELD: hydroelectric power engineering. SUBSTANCE: hydroelectric power plant has floating member in the form of catamaran 1 with two hulls 2 joined to deck 3 mounting on its underside flow passage 5 with hydraulic turbine placed between inlet mouth 7 and outlet piping 8. Catamaran 1 is held in position in water stream by means of cable-and-anchor system 10 and terminal section 12 of outlet piping 8 has increased sectional area in flow direction which is petal-shaped, or terminal section is divided into two or more pipes. Power plant is installed in river stream, its section being contracted by water-retaining structure to form high-speed water-flow passage at locating point of catamaran 1 carrying hydraulic turbine. EFFECT: facilitated construction of hydroelectric power plant. 4 cl, 9 dwg
Title | Year | Author | Number |
---|---|---|---|
SUBMERSIBLE FREE-FLOW MICROHYDROELECTRIC STATION | 2003 |
|
RU2247859C1 |
SPILLWAY STRUCTURE ON ROCK BED | 2000 |
|
RU2211280C2 |
COASTAL FLOW HYDROELECTRIC POWER PLANT | 2022 |
|
RU2804790C1 |
SPILLWAY STRUCTURE | 2000 |
|
RU2211281C2 |
TOE BASIN OF SPILLWAY STRUCTURE | 2000 |
|
RU2195529C2 |
DEVICE FOR HYDRAULIC STORING OF GRAINY WASTES | 1995 |
|
RU2087616C1 |
SPILLWAY WORKS | 1995 |
|
RU2131494C1 |
HYDRAULIC TURBINE PLANT | 2001 |
|
RU2216644C2 |
METHOD OF MINERAL HEAP LEACHING AND PILE FOR ITS EMBODIMENT | 2000 |
|
RU2171372C1 |
PROCESS OF REPAIR OF MULTISECTIONAL CONCRETE DAM | 2000 |
|
RU2200220C2 |
Authors
Dates
1997-08-27—Published
1995-08-31—Filed