FIELD: hydraulic engineering, construction of multispan spillway structures on rock bed. SUBSTANCE: spillway structure includes spillway, toe basin and pump station. Toe basin is formed by bottom and side and apron walls with cantilevers by bed. Feet of spillway and walls of toe basin are embedded in bed beneath design position of unfixed rock bottom. Bases under internal cantilevers of walls are fixed by pressure grouting and abovementioned cantilevers are anchored to them. Apron wall on side of toe basin is concave in plan and it has bottom water conduit to remove abrasive material from toe basin. Guarding walls of toe basin of spillway structure show increased stability even unfixed in rock bed of toe basin which diminishes usage of materials for its construction. EFFECT: diminished usage of materials for construction spillway structure. 7 cl, 5 dwg
Title | Year | Author | Number |
---|---|---|---|
TOE BASIN OF SPILLWAY STRUCTURE | 2000 |
|
RU2195529C2 |
SPILLWAY STRUCTURE | 2000 |
|
RU2211281C2 |
SPILLWAY WORKS | 1995 |
|
RU2131494C1 |
SPILLWAY | 0 |
|
SU1808900A1 |
DEVICE FOR HYDRAULIC STORING OF GRAINY WASTES | 1995 |
|
RU2087616C1 |
HYDRAULIC-MINE DUMP OF INDUSTRIAL WASTE | 2003 |
|
RU2252295C2 |
RECONSTRUCTION METHOD FOR SPILL-AWAY OF HIGH CONCRETE ARCHED BARRAGE (VARIANTS) | 2003 |
|
RU2233362C1 |
GULLY TWO-STAGE SLURRY DUMP FOR GRANULAR INDUSTRIAL WASTE | 2004 |
|
RU2275458C1 |
PROCESS OF REPAIR OF MULTISECTIONAL CONCRETE DAM | 2000 |
|
RU2200220C2 |
DEVICE FOR STORING WATER-CONTAINING WASTE | 1995 |
|
RU2102557C1 |
Authors
Dates
2003-08-27—Published
2000-12-18—Filed