FIELD: hydraulic engineering, repair of high arch and gravity concrete dams. SUBSTANCE: technology of section by section injection provides for temporarily omitted sections in which additional opening of cracks and/or contact seams takes place for some time within permissible value near upper face of dam while adjacent sections are injected. This approach makes it feasible to fill cracks and/or seams opened in omitted section in this manner under relatively low pressure which prevents opening of cracks and/or contact seams in adjacent sections already injected with concrete and eliminates need in repeat injection. EFFECT: eliminated need in repeat injection of concrete. 2 cl, 4 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD TO INCREASE STABILITY OF CONCRETE DAM ON BED ROCK | 2012 |
|
RU2501904C1 |
SPILLWAY STRUCTURE ON ROCK BED | 2000 |
|
RU2211280C2 |
EARTH DAM WITH FROZEN GROUND CURTAIN IN ITS BODY AND BASE | 1996 |
|
RU2153555C2 |
CONCRETE DAM, PROCESS OF ITS ERECTION, METHOD OF ITS EXPLOITATION AND GEAR CONTROLLING TEMPERATURE CONDITION OF CONCRETE BY OUTER FACE OF DAM | 2001 |
|
RU2224067C2 |
CONCRETE DAM ON ROCK FOUNDATION | 2011 |
|
RU2496939C2 |
TOE BASIN OF SPILLWAY STRUCTURE | 2000 |
|
RU2195529C2 |
CONCRETE DAM ON ROCK BASE | 0 |
|
SU1030471A1 |
METHOD FOR ELIMINATING LEAKS AND INCREASED FILTRATION OF SOIL HYDRAULIC STRUCTURES | 2020 |
|
RU2754380C1 |
METHOD OF EARTH DAM CONSTRUCTION | 1998 |
|
RU2145372C1 |
EARTH DAM | 2013 |
|
RU2550885C2 |
Authors
Dates
2003-03-10—Published
2000-12-25—Filed