FIELD: recultivation of disturbed land. SUBSTANCE: formed on upper platform of slope along its crest is a row of blocks by means of dams with subsequent filling them with hydraulic mixture of potentially fertile ground, beginning from most remote block from main pipeline. Height of mixture in each block depends on block parameters, physicomechanical properties of ground and hydraulic mixture, and on parameters of prism of possible caving of recultivated slope. EFFECT: higher efficiency. 3 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF MECHANICAL AND HYDRAULIC RECULTIVATION OF LANDS | 2014 |
|
RU2569146C1 |
METHOD OF QUARRIES RECLAMATION (VERSIONS) | 2010 |
|
RU2433268C1 |
SET OF MECHANICAL AND HYDRAULIC RECULTIVATION OF DISTURBED LANDS | 2014 |
|
RU2569145C1 |
METHOD OF ACCELERATED MECHANOHYDRAULIC RECULTIVATION OF MINED SPACE OF OPEN MINE WORKINGS | 2020 |
|
RU2737300C1 |
METHOD OF LAND RECLAMATION, DISTURBED BY DREDGING WORKS | 2013 |
|
RU2527368C1 |
RESTORATION METHOD OF DISTURBED LANDS AT OPEN DEVELOPMENT OF DEPOSITS OF MINERAL RESOURCES | 2010 |
|
RU2444628C1 |
METHOD OF REGULTIVATING THE SLOPES OF DUMPS OF HARD ROCK | 0 |
|
SU1176079A2 |
METHOD OF SHAPING DUMPS | 0 |
|
SU1273558A1 |
METHOD OF PROTECTING LEDGES OF EDGES OF PITS OF CRYOLITHIC ZONE FROM THAWING | 2014 |
|
RU2551583C1 |
METHOD FOR RECULTIVATION OF OPEN-PIT WORKINGS | 2017 |
|
RU2655548C1 |
Authors
Dates
1997-08-27—Published
1995-03-28—Filed