FIELD: mining operations.
SUBSTANCE: method comprises the construction of three artificial elements: impervious screen, a protective berm, a protective coating. And the impervious screen is created by drilling of inclined wells of large diameter in the winter period from the upper site of the ledge nonworking edge side most affected to thawing, parallel to the slope surface at its full height followed by filling them with ice rock stones, chilled fresh water and freezing with natural cold, and the protective berm is erected over the mouth parts of the wells, starting from the upper edge of the ledge of the tapered section of calculated height, using layered freezing of overburden rocks, which in the summer period, including the surface of the ledge slope, to prevent thawing, covered with the protective coating, which is made in the form of removable flexible moisture-heat- and light-reflecting mat, removed with the onset of winter, the thickness of which is determined based on the mathematics.
EFFECT: prevention of thawing of frozen rocks of non-working ledge edges of pits.
1 dwg
Authors
Dates
2015-05-27—Published
2014-02-20—Filed