FIELD: construction engineering. SUBSTANCE: this relates to technology of erecting walls in subsurface ground at building of relieving and load-bearing walls for underground premises. According to method, bore-holes are drilled for cast-in-place columns at distance between them less than diameter of column with subsequent concreting them. Odd columns are made of concrete, and even columns are additionally strengthened by reinforcement framework. Diameter of reinforcement framework is 10-15% less than diameter of even column. EFFECT: high efficiency. 2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR ARRANGEMENT OF BORED PILES PACKET | 2007 |
|
RU2352718C1 |
METHOD FOR ERECTION OF BORED PILES PACKET | 2007 |
|
RU2351710C1 |
METHOD FOR ARRANGEMENT OF BORED PILES PACKET | 2007 |
|
RU2352719C1 |
METHOD FOR CONSTRUCTION OF "WALL IN EARTH" | 1998 |
|
RU2148123C1 |
METHOD FOR BORED AND CAST-IN-PLACE PILE FORMING IN GROUND HAVING SILTY INTERLAYERS | 2004 |
|
RU2260653C1 |
PROCESS OF DEVELOPMENT OF FOUNDATION PIT | 2002 |
|
RU2209268C1 |
DRILLING REINFORCED CONCRETE COLUMN AND METHOD FOR ITS CONSTRUCTION | 2022 |
|
RU2798149C2 |
PROCESS OF ERECTION OF ENCLOSING WALL IN GROUND | 2001 |
|
RU2204656C1 |
METHOD FOR CONSTRUCTING DRILLED PILE IN PERMAFROST SOIL | 2023 |
|
RU2803751C1 |
METHOD FOR CONSTRUCTION OF UNDERGROUND MULTISTOREY BUILDINGS | 2015 |
|
RU2604098C1 |
Authors
Dates
1997-10-27—Published
1997-03-24—Filed