FIELD: oil production industry. SUBSTANCE: according to method, working agent is injected through injection wells and oil is recovered through producing wells. Development is carried out until watering of recovered product exceeds 50%. Periodically injected through injection wells is oil emulsion with content of brine water from deposit being developed reaches 60-80% which is created in result of interaction in bed conditions of brine water, oil and chemical products and which is stable at bed temperature. After injection of oil emulsion, used as working agent is water recovered together with oil in development of deposit. This increases oil recovery at early and late stages of deposit development. EFFECT: high efficiency.
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR DEVELOPMENT OF OIL DEPOSIT | 1996 |
|
RU2096597C1 |
METHOD FOR DEVELOPMENT OF OIL DEPOSIT | 1996 |
|
RU2094598C1 |
METHOD OF DEVELOPING OIL POOL | 1995 |
|
RU2065935C1 |
METHOD FOR DEVELOPMENT OF OIL DEPOSIT | 1996 |
|
RU2096593C1 |
METHOD OF DEVELOPING OIL POOL | 1995 |
|
RU2065938C1 |
METHOD FOR DEVELOPMENT OF NONUNIFORM STRATA OIL DEPOSIT | 1996 |
|
RU2096594C1 |
METHOD OF DEVELOPING NONUNIFORM OIL POOL | 1995 |
|
RU2065936C1 |
METHOD FOR DEVELOPMENT OF OIL POOL | 1995 |
|
RU2084617C1 |
METHOD FOR DEVELOPMENT OF OIL DEPOSIT | 1996 |
|
RU2124120C1 |
METHOD FOR DEVELOPMENT OF OIL DEPOSIT | 1996 |
|
RU2094601C1 |
Authors
Dates
1997-11-20—Published
1996-07-05—Filed