FIELD: railway transport; repair of cars and replacement of bogies to suit track gauge. SUBSTANCE: device has transborder with two parallel sections of track with pitch equal to pitch of three interrupted approach tracks broken by transborder. It can move square to approach tracks and is arranged in pit. Pit in break of middle approach track has two support beams for car arranged at height lower that car frame at a distance less than width of car, but greater than width of bogies. Transborder has two platforms. Upper one has two track sections and is installed on lower one for lifting through value exceeding height of pivot connecting bogie with car which provides passing of bogie under lower cut of one of two support beams. EFFECT: enlarged operating capabilities. 3 dwg
Title | Year | Author | Number |
---|---|---|---|
DEVICE FOR CHANGING RAILWAY CAR BOGIES | 1998 |
|
RU2153995C2 |
FLOW LINE FOR DISASSEMBLING RAILWAY SKELETONS | 1997 |
|
RU2116398C1 |
FLOW-LINE FOR ASSEMBLING SECTIONS OF RAIL-AND-SLEEPER UNITS | 1997 |
|
RU2115782C1 |
DEVICE FOR DISMANTLING OF RAILWAY TRACK RAIL-AND-SLEEPER ASSEMBLY LINKS | 1997 |
|
RU2128758C1 |
DEVICE FOR REPLACING CAR BOGIES | 1997 |
|
RU2130394C1 |
WOODEN TIE SORTING AND PACKAGING DEVICE | 1997 |
|
RU2130420C1 |
DEVICE FOR DISASSEMBLING OF RAIL FASTENERS | 1997 |
|
RU2126474C1 |
METHOD FOR REPLACING WHEEL PAIRS OF RAILWAY CARRIAGE (VERSIONS) | 2016 |
|
RU2626425C1 |
LIFTING-AND-TRANSPORTATION DEVICE FOR CHANGING PASSENGER CAR BOGIES ON ARRIVAL-DEPARTURE TRACKS OF RAILWAY STATIONS | 1997 |
|
RU2130397C1 |
CONTINUOUS LINE FOR REPAIR OF TRACK SKELETON LINKS | 2001 |
|
RU2210654C2 |
Authors
Dates
1997-12-20—Published
1995-10-27—Filed