FIELD: construction. SUBSTANCE: method includes mounting of prefabricated lining and injection behind the lining of injection compound. Lining is installed in a spaced relation to walls of working over its entire perimeter and formed gap is filled with waterproofing damping compound. EFFECT: higher efficiency of support. 2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF CONSTRUCTION OF UNDERGROUND WORKINGS IN UNSTABLE WATER-SATURATED GROUNDS | 1995 |
|
RU2111361C1 |
METHOD FOR TUNNEL CONCRETE LINING | 1991 |
|
RU2030584C1 |
DOUBLE-LEVEL SINGLE-VAULT TRANSFER STATION UNIT OF DEEP SUBWAY | 1996 |
|
RU2131960C1 |
METHOD TO ELIMINATE WATER LEAKAGES IN UNDERGROUND ENGINEERING UTILITIES | 2011 |
|
RU2473745C1 |
PROCESS OF ROCK FREEZING DURING CONSTRUCTION OF UNDERGROUND STRUCTURES AND GEAR FOR ITS IMPLEMENTATION | 1996 |
|
RU2109951C1 |
BRIDGE SUPPORT | 1996 |
|
RU2099467C1 |
SHAFT LINING, COMPLEX FOR ITS ERECTION AND METHOD OF ITS ERECTION | 2012 |
|
RU2502873C1 |
REINFORCED DRAINING COMPOSITE GEOTEXTILE MATERIAL | 1995 |
|
RU2103439C1 |
METHOD FOR ERECTING DEEP SUBWAY STATION | 1993 |
|
RU2061148C1 |
METHOD FOR CONSTRUCTING A ROAD ACROSS A STREAM FLOW ON THE PERMAFROST GROUND | 1992 |
|
RU2035537C1 |
Authors
Dates
1997-12-20—Published
1995-06-13—Filed