FIELD: construction, particular, methods of construction of underground workings in unstable water-saturated grounds. SUBSTANCE: method includes establishment of ice-ground guard and driving of underground working with installation of support. The method is distinguished by the fact that ice-ground guard is defrosted along the axis of underground working by parts multiple to length of lining ring, then, thawed incoherent ground is solidified by injections by separate parts. EFFECT: higher efficiency. 1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR SUPPORT OF UNDERGROUND WORKING IN WATER-LOGGED FROZEN GROUNDS | 1995 |
|
RU2099534C1 |
METHOD FOR DRIVING TUNNELS IN UNSTABLE WATER-SATURATED ROCKS | 1992 |
|
RU2043501C1 |
METHOD OF INCLINED TUNNELS CONSTRUCTION IN WEAK WATER-SATURATED SOILS | 2020 |
|
RU2739880C1 |
METHOD FOR ERECTING DEEP SUBWAY STATION | 1993 |
|
RU2061148C1 |
METHOD FOR DRIVING DEEP TUNNELS IN LOOSE GROUND | 1996 |
|
RU2096621C1 |
METHOD FOR TUNNEL CONCRETE LINING | 1991 |
|
RU2030584C1 |
PROCESS OF CONSTRUCTION OF TUNNELS IN SOFT WATER-SATURATED GROUND | 1991 |
|
RU2006583C1 |
METHOD FOR PERFORATING A FOREHEAD OF A TUNNEL BOTTOM | 2019 |
|
RU2723422C1 |
DOUBLE-LEVEL SINGLE-VAULT TRANSFER STATION UNIT OF DEEP SUBWAY | 1996 |
|
RU2131960C1 |
METHOD FOR CONSTRUCTION OF ESCALATOR CASCADE COMPLEX FOR THE ENTRANCE TO THE METRO STATION, CONSTRUCTED USING CUT-AND-COVER METHOD | 2021 |
|
RU2766876C1 |
Authors
Dates
1998-05-20—Published
1995-06-13—Filed