METHOD OF SIMULTANEOUS-SEPARATE AND ALTERNATIVE OPERATION AND DEVELOPMENT OF SEVERAL FORMATIONS WITH ONE WELL Russian patent published in 2009 - IPC E21B43/14 

Abstract RU 2350742 C1

FIELD: oil and gas industry.

SUBSTANCE: invention refers to well operation of multi-formation hydro-carbon deposits. The method consists in drill-string running at least one column without or with a blanked-off end with at least one working packer lowered below upper formation without or with a string breaker below and above of which there are lowered at least by one seats for supplying working agent through them correspondingly to lower and upper formations, further the method consists in packer seating and in pressure testing the packer from above. According to the invention before running into a well the pipe string is additionally equipped with at least one process packer without or with the string breaker installed under the packer. The string breaker is arranged at a specified distance over the working packer. Before or after running pipe string into the well removable blind plugs in the capacity of removable valves are installed into seats. Further the pipe string is run and the working packer is arranged at the specified depth. By means of the string breaker lower pipe string is detached with the working packer from the upper pipe string; the upper pipe string is lifted with the process packer at the specified distance. Setting the packer is performed thus creating zone of pipe string disconnection between the process and working packers. The working packer is pressure tested by means of building pressure inside the pipe string and in the said zone between the packers. When tightness of working packer seat is checked and ensured, the process packer is released and lifted above ground together with the upper pipe string. The well is put into operation or the upper pipe string is run into the well without the process packer and is connected with the lower pipe string. Further by means of cable rope removable blind plugs are replaced in seats with removable connecting branches and working agent is pumped through them into corresponding formations or fluid is withdrawn.

EFFECT: increased efficiency of method due to tightness of packer seat, also possibility to test packer tightness and to develop above laying formations separately.

10 cl, 5 dwg

Similar patents RU2350742C1

Title Year Author Number
METHOD OF GARIPOV'S WELL OPERATION AND DEVICE FOR ITS REALISATION (VERSIONS) 2008
  • Garipov Oleg Marsovich
RU2398100C2
DOWNHOLE DEVICE 2012
  • Garipov Oleg Marsovich
RU2529310C1
DOWNHOLE PUMP UNIT 2011
  • Garipov Oleg Marsovich
RU2506416C1
METHOD FOR SIMULTANEOUS SEPARATE MULTIPLE-ZONE WELL OPERATION 2006
  • Sharifov Makhir Zafar Ogly
  • Leonov Vasilij Aleksandrovich
  • Sineva Julija Nikolaevna
  • Garipov Oleg Marsovich
  • Azizov Fatali Khubali Ogly
  • Voronin Pavel Petrovich
RU2313659C1
BOREHOLE PLANT FOR SIMULTANEOUS SEPARATE AND ALTERNATE OPERATION OF SEVERAL FORMATIONS BY SINGLE WELL 2003
  • Sharifov Makhir Zafar Ogly
  • Leonov V.A.
  • Uzhakov V.V.
  • Krasnoperov V.T.
  • Kuznetsov N.N.
  • Garipov O.M.
  • Gurbanov Sejfulla Ramiz Ogly
  • Nabiev Natig Adil Ogly
  • Nabiev Fizuli Ashraf Ogly
  • Sineva Ju.N.
  • Jusupov R.F.
RU2262586C2
GARIPOV HYDRAULIC REUSABLE PACKER, INSTALLATION AND METHOD FOR ITS IMPLEMENTATION 2010
  • Garipov Oleg Marsovich
  • Mustafin Ehdvin Lenarovich
RU2425955C1
GARIPOV PACKER WITH ELECTRONIC INSTRUMENT (VERSIONS) AND METHOD OF ITS IMPLEMENTATION 2011
  • Garipov Oleg Marsovich
RU2500879C2
PROCEDURE FOR COMPLETION AND OPERATION OF WELL 2009
  • Garipov Oleg Marsovich
RU2394978C1
CHECK VALVE 2023
  • Garipov Oleg Marsovich
RU2810782C1
GARIPOV PUMP UNIT FOR SIMULTANEOUS SEPARATE OPERATION OF WELLS (VERSIONS) 2009
  • Garipov Oleg Marsovich
RU2438043C2

RU 2 350 742 C1

Authors

Garipov Oleg Marsovich

Bagrov Oleg Viktorovich

Mustafin Ehdvin Lenarovich

Dates

2009-03-27Published

2007-05-21Filed