FIELD: mining industry, particular, mining of steeply dipping mineral beds. SUBSTANCE: the offered method includes development of mineral deposits by mine workings, preparation for mining, upward extraction of mineral by rill cut. After extraction of each layer, formed at its end is room with horizontal base for performance from this room of mineral extraction in the next inclined layer displaced in horizontal plane through the value equalling the layer width and extracted in opposite direction to the previous layer but at the same angle to horizontal plane. Extracted mineral is transported through vertical workings sunk on the joint of inclined layer and horizontal sections, worked-out space is filled. EFFECT: higher efficiency. 5 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR DEVELOPMENT OF MINERAL DEPOSITS | 1996 |
|
RU2096617C1 |
PROCESS OF DEVELOPMENT OF RESERVES OF THICK STEEPLY DEEPENING DEPOSITS OF ORE LOCATED UNDER PITS | 2001 |
|
RU2202041C2 |
METHOD FOR COMBINED DEVELOPMENT OF MINERAL DEPOSITS | 2009 |
|
RU2400625C1 |
METHOD FOR DEVELOPMENT OF GENTLY SLOPING AND INCLINED BUMP HAZARDOUS ORE DEPOSITS | 2019 |
|
RU2723812C1 |
METHOD FOR DEVELOPMENT OF STEEPLY DIPPING ORE BODIES LIMITED IN PLAN VIEW | 2021 |
|
RU2761791C1 |
METHOD TO DEVELOP GENTLY SLOPING COAL BED | 1992 |
|
RU2029867C1 |
DEVELOPMENT METHOD OF ORE DEPOSITS WITH BLOCK CAVING SYSTEM WITH ACTIVE FLEXIBLE SEPARATING COVERING | 2009 |
|
RU2426881C1 |
METHOD OF COMBINED MINING OF MINERAL DEPOSITS | 0 |
|
SU1461930A1 |
METHOD OF DEVELOPING THICK ORE DEPOSITS BY UNDERGROUND MINING WITH INTERCHAMBER PILLARS SUPPORT | 2009 |
|
RU2405109C1 |
COMBINED WORKING OF STEEP MINERALS DEPOSITS NEARBY WATER STRUCTURES | 2014 |
|
RU2565310C1 |
Authors
Dates
1998-01-10—Published
1996-09-05—Filed