FIELD: development of deposits of mineral reserves. SUBSTANCE: invention can be employed for combined development of thick steeply DEEPENING deposits presented by ores of medium and high values. Characteristic feature of process lies in that all reserves beneath bottom of pit are opened up by shaft that passes to last deposit. Reserves under pits are developed in rising order of chamber-level system of mining with subsequent filling of developed space by combined backfill and wide chambers of second sequence are filled up with rock gobbing. EFFECT: increased safety of operation, reduced expenses for stowage material and shortened time of development of reserves. 2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF UNDERGROUND MINING OF ORE DEPOSITS | 1999 |
|
RU2167296C1 |
METHOD OF UNDERGROUND MINING OF THICK FLAT DEPOSITS OF LOW-HARDNESS ORES | 2000 |
|
RU2184850C1 |
METHOD FOR EXCAVATION OF STEEP-FALLING ORE DEPOSITS | 2002 |
|
RU2229600C1 |
METHOD FOR EXTRACTION OF STEEP-FALLING DEPOSITS OF WEAK ORES | 2003 |
|
RU2248448C1 |
METHOD OF UNDERGROUND MINING OF STEEPLY DIPPING VEIN DEPOSITS | 2001 |
|
RU2193660C1 |
METHOD OF PREPARATION OF BOTTOM OF STEEPLY-DIPPING ORE DEPOSIT BLOCK | 2001 |
|
RU2206746C1 |
METHOD FOR COMBINED DEVELOPMENT OF MINERAL DEPOSITS | 2009 |
|
RU2400625C1 |
METHOD FOR STEEP ORE DEPOSIT DEVELOPMENT | 2004 |
|
RU2278972C1 |
METHOD FOR BLOCK BOTTOM CREATION IN UPWARD ORE DEPOSIT MINING | 2006 |
|
RU2310075C1 |
UNDERGROUND DEVELOPMENT METHOD OF SERIES OF THIN STEEP DEPOSITS | 2009 |
|
RU2425218C1 |
Authors
Dates
2003-04-10—Published
2001-06-18—Filed