FIELD: mining industry; applicable in underground mining of gently dipping coal seams for repeated use of workings in pillarless mining of coal. SUBSTANCE: the offered method includes driving of workings on boundary with worked-out space, erection of breaker row, roof bolting for support of working roof before stoping, installation of temporary support and replacement with yielding permanent arc-wise support consisting of segments. After erection of permanent support, roof bolting is removed, but one-two anchors are left at pillar. EFFECT: higher efficiency. 4 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR DEVELOPMENT OF STRATA DEPOSITS OF MINERALS | 1996 |
|
RU2102592C1 |
METHOD FOR DEVELOPMENT OF STEEP COAL SEAMS OF MEDIUM THICKNESS | 1994 |
|
RU2085738C1 |
METHOD FOR MINING THICK STEEP COAL SEAMS | 1994 |
|
RU2085739C1 |
METHOD FOR STABILIZING INTERLAYING COAL MASS | 1997 |
|
RU2134784C1 |
METHOD OF FULL DEVELOPMENT OF GENTLY SLOPING COAL BEDS WITH POWER-DRIVEN SYSTEMS WITHOUT ANY PREPARATORY MINE WORKINGS | 2010 |
|
RU2444624C1 |
METHOD FOR FORMING A DISMANTLING CHAMBER WHEN DEVELOPING SLIM COAL BEDS | 2020 |
|
RU2743162C1 |
REMOVAL METHOD OF POWERED MINING FACE COMPLEXES | 2007 |
|
RU2384708C2 |
METHOD TO SAFEGUARD DEVELOPMENT OPENINGS | 2010 |
|
RU2441164C1 |
METHOD FOR CONDUCTING MINING WORKS IN DEVELOPMENT OF FLAT COAL BEDS | 2022 |
|
RU2805691C1 |
SYSTEM OF EXPLOITATION OF GENTLY DIPPING SEAMS | 2000 |
|
RU2179638C1 |
Authors
Dates
1998-01-10—Published
1996-06-06—Filed