FIELD: mining; applicable in formation of haulage berms. SUBSTANCE: the offered method includes excavation of inclined permanent trench with its passing into working trench, widening it in retreat with preliminary sloping of bench, formation of flank on the given level and completion of all members of transverse profile. Beginning of permanent trench is displaced for the value of lead of cutting-in of new level. After formation of flank on the given level, rock protective pillar is outlined on the side of roadway, and muck is cleaned through the design depth. EFFECT: reduced labor input in formation of haulage ramp due to decrease of its width. 3 dwg
Title | Year | Author | Number |
---|---|---|---|
QUARRY DEVELOPMENT METHOD | 1996 |
|
RU2118456C1 |
METHOD FOR COMBINATION DEVELOPMENT OF MINERAL DEPOSITS | 1998 |
|
RU2137921C1 |
EXPLOSIVE | 1995 |
|
RU2102367C1 |
METHOD FOR FORMATION OF STEEPLY INCLINED TRANSPORT ACCESS TRACK | 2010 |
|
RU2425220C1 |
METHOD FOR SELECTIVE MINING OF DIAMOND-BEARING ORES | 1996 |
|
RU2117762C1 |
FLOATING WATER INTAKE | 1996 |
|
RU2117731C1 |
MIXTURE FOR FILLING OF WORKED-OUT SPACE | 1995 |
|
RU2100615C1 |
STICKING COMPOSITION FOR ISOLATING DIAMONDS | 1995 |
|
RU2100088C1 |
METHOD OF PREPARING LIME | 1996 |
|
RU2098369C1 |
METHOD FOR PREPARATION OF EXPLOSIVE MIXTURE BASED ON AMMONIACAL SALTPETER AND FOAMED POLYMER | 1994 |
|
RU2094415C1 |
Authors
Dates
1998-01-10—Published
1995-06-14—Filed