FIELD: oil and gas industry.
SUBSTANCE: double-ended method of the deposit opening during underground operations includes shaft sinking of at least two holes, each hole having its own job site. Opening of the deposit is made by underground horizontal and/or inclined workings from each hole. As the shaft sinking progresses the underground horizontal workings are made from the hole at a distance of at least 5 diameters of the hole. Vertical wells are drilled from the surface and horizontal cuts and when the lower horizontal working is reached the well is drilled up to the project diameter of the air raise. Horizontal workings are placed vertically, one by one, at a distance to be determined by technical capabilities of the drilling rig. The upper part of the air raise is made from the surface through quaternary deposits by a usual method. At the first stage each end of the deposit is ventilated separately, at the second stage fresh air is supplied through a pair of combined developments - a borehole and the air riser at one end while outgoing jet is outputted through the combined developments of the other end.
EFFECT: method allows reducing scope of works during shaft sinking, increasing the sinking rate, reducing the period of construction and commissioning of a mine or minery, increasing reliability of ventilation due to ventilation risers.
3 dwg
Title | Year | Author | Number |
---|---|---|---|
MINING METHOD OF THIN FLAT ORE BODY | 2010 |
|
RU2456452C2 |
LAYERED ROOM-AND-PILLAR SYSTEM WITH COMPLETE STOWING | 2011 |
|
RU2486340C2 |
METHOD OF RISE RILL CUT MINING WITH FILLING OF PIPE-LIKE KIMBERLITE DEPOSITS BY POWDER MINING COMPLEX | 1998 |
|
RU2155868C2 |
OPENING OF DEPOSIT AT UNDERGROUND MINING | 2014 |
|
RU2591705C1 |
METHOD OF UNDERGROUND VISCOUS OIL WINNING FROM STRATUM | 2007 |
|
RU2334090C1 |
METHOD OF MINING KIMBERLITE DEPOSIT EXTENDED ALONG STRIKE BY INCLINED SLICING UNDER FLEXIBLE GUARD ROOFING BY POWERED MINING SET | 1998 |
|
RU2151295C1 |
METHOD FOR OPENING AND PREPARATION OF MINE FIELD FOR FLAT-LAYING COAL SEAM | 2005 |
|
RU2278262C1 |
DEEP UNDERGROUND PETROLEUM PRODUCTION WITH DIRECTIONAL SHAFTS | 2021 |
|
RU2773391C1 |
METHOD FOR VENTILATION OF DEEP METRO TUNNELS DURING THEIR CONSTRUCTION | 1996 |
|
RU2105098C1 |
METHOD FOR DEVELOPMENT OF KIMBERLITE PIPES BY MECHANIZED COMPLEX | 1997 |
|
RU2135772C1 |
Authors
Dates
2014-06-20—Published
2012-12-03—Filed