FIELD: construction engineering. SUBSTANCE: this brings automation to entire set of technological operations and converts construction process into flow-like procedure with high level of productivity. This is achieved due to that earth works, arrangement of foundations and basement premises, brick walls, floors and ceilings, roofing and flooring operations for buildings and structures are carried out by set of working members. Carriage is provided with mechanism for replacement of working members. Number of lateral frames is determined according to amount of construction operations. EFFECT: higher efficiency. 3 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF CONSTRUCTION OF BUILDINGS | 2023 |
|
RU2812973C1 |
BRICK LAYING ARRANGEMENT | 0 |
|
SU1679014A1 |
METHOD OF MANUFACTURING LARGE-SIZED FINISHED THREE-DIMENSIONAL MODULE AND METHOD OF BUILDING CONSTRUCTION FROM LARGE-SIZE FINISHED 3D MODULES | 2018 |
|
RU2712845C1 |
METHOD AND KIT TO ERECT INSERTED STRUCTURE BETWEEN TWO EXISTENT BUILDINGS | 2005 |
|
RU2292434C1 |
BUILDINGS AND STRUCTURES WITH BEARING MONOLITHIC REINFORCED CONCRETE STRUCTURES CONSTRUCTION METHOD USING THE REINFORCED CONCRETE WALL PANELS | 2018 |
|
RU2678750C1 |
METHOD FOR AUTOMATED CONSTRUCTION OF STRUCTURES | 2021 |
|
RU2761783C1 |
METHOD FOR AUTOMATED INSTALLATION OF EXTERNAL FENCE FOR GRAVITATIONAL ENERGY STORAGE AND SYSTEM FOR ITS IMPLEMENTATION | 2021 |
|
RU2759162C1 |
METHOD FOR DESTRUCTION OF MONOLITHIC ARRAYS AND DEVICE FOR ITS IMPLEMENTATION | 2013 |
|
RU2547526C2 |
METHOD OF ESTABLISHING A STANDARD FOUNDATION USING RIBBED SLABS OF CEILINGS (COVERINGS) | 2017 |
|
RU2671019C1 |
AUTOMATED METHOD OF ERECTION OF SOLID FOUNDATIONS AND WALLS OF BUILDINGS AND STRUCTURES OF PLASTIC BLOCKS | 2012 |
|
RU2532117C2 |
Authors
Dates
1998-02-20—Published
1996-04-22—Filed