FIELD: compressor plants for drying compressed gas. SUBSTANCE: in the course of drying the compressed gas delivered by compressor to storage accumulator, gas is passed through water-and-oil separator and through two adsorbers operating in turn. Provision is made for regular purging of water-and-oil separator and regeneration of adsorbent by gas dried beforehand. Purging the adsorbent in each adsorber is started when its housing is heated to temperature of 340 to 360 C and is effected by feeding the gas from the accumulator throttled to a pressure of 1.5 to 2.5 kgf/sq.cm. Purging is effected by pulses, duration of each pulse is equal to 2 min at 15-min interval, purging is continued for 3.5 - 4.5 h. After purging, heating of adsorber is discontinued and purging of the adsorbent is continued till adsorber housing gets cooled to 70 C. Purging the water-and-oil separator is effected by return flow of gas taken from the adsorber operating for drying. EFFECT: enhanced efficiency. 1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF COMPRESSED GAS DEHYDRATION | 2001 |
|
RU2182513C1 |
AUTOMOBILE GAS FILLING COMPRESSOR PLANT | 1996 |
|
RU2087747C1 |
METHOD OF PRODUCTION OF DRIED AND CLEANED GAS | 1998 |
|
RU2143588C1 |
INSTALLATION FOR PREPARATION OF IMPULSE GAS FOR PNEUMATIC SYSTEMS OF SHUT-OFF-REGULATOR DEVICES OF GAS MAINS | 2000 |
|
RU2163990C1 |
ADSORBENT REGENERATION PROCESS | 1999 |
|
RU2168360C2 |
PLANT FOR PRODUCING PULSE GAS FOR AIR-OPERATED SYSTEMS OF CONTROL VALVING UNITS FOR MAIN PIPELINES | 2004 |
|
RU2273794C1 |
INSTALLATION FOR PREPARING IMPULSE GAS FOR PNEUMATIC SYSTEMS OF CUTTING OFF AND ADJUSTING DEVICES OF MAIN GAS DUCTS | 2002 |
|
RU2209365C1 |
DEVICE FOR PREPARING PULSE GAS FOR AIR SYSTEMS OF VALVING DEVICES OF PIPELINES | 2003 |
|
RU2239123C1 |
INSTALLATION FOR DEHUMIDIFICATION AND CLEANING OF GAS | 0 |
|
SU1150009A1 |
COMPRESSOR AUTOMATIC BLOWING SYSTEM | 0 |
|
SU1724931A1 |
Authors
Dates
1998-03-10—Published
1997-03-26—Filed