FIELD: pipeline systems.
SUBSTANCE: device has system of pipelines, electrical equipment, block for automatic control, and unit for gas drying and purification connected with the pipeline. The unit for drying and purification has water-and-oil separator-filter, blowing chamber, two absorbers, whose inlets are provided with stop electrically-driven valves and outlets are provided with check valves, and end filter connected in series. The separator-filter is connected with the blowing chamber through the accumulating vessel and stop valve. The absorbers are connected with the blowing chamber through stop air-operated valves. The pipeline which connects the absorbers with the blowing chamber is additionally provided with expansion chamber interposed between the stop air-operated valves and the check valve. The expansion chamber has nozzle and reflection plate.
EFFECT: enhanced efficiency and reliability of operation.
1 cl, 3 dwg
Title | Year | Author | Number |
---|---|---|---|
INSTALLATION FOR PREPARING IMPULSE GAS FOR PNEUMATIC SYSTEMS OF CUTTING OFF AND ADJUSTING DEVICES OF MAIN GAS DUCTS | 2002 |
|
RU2209365C1 |
PLANT FOR PRODUCING PULSE GAS FOR AIR-OPERATED SYSTEMS OF CONTROL VALVING UNITS FOR MAIN PIPELINES | 2004 |
|
RU2273794C1 |
INSTALLATION FOR PREPARATION OF IMPULSE GAS FOR PNEUMATIC SYSTEMS OF SHUT-OFF-REGULATOR DEVICES OF GAS MAINS | 2000 |
|
RU2163990C1 |
AUTOMOBILE GAS FILLING COMPRESSOR PLANT | 1996 |
|
RU2087747C1 |
DOUBLE-CIRCUIT MEMBRANE-ADSORPTION UNIT FOR COMPRESSED GAS DRYING | 2018 |
|
RU2713359C1 |
METHOD OF DRYING COMPRESSED GAS | 1997 |
|
RU2106528C1 |
METHOD OF PRODUCTION OF DRIED AND CLEANED GAS | 1998 |
|
RU2143588C1 |
GAS FILLING STATION | 2004 |
|
RU2244205C1 |
COMPRESSED NATURAL GAS DRYER | 2022 |
|
RU2790902C1 |
METHOD OF FILLING VEHICLE WITH NATURAL GAS AND MOVABLE GAS FILLING STATION | 2006 |
|
RU2305224C2 |
Authors
Dates
2004-10-27—Published
2003-04-29—Filed