FIELD: construction engineering. SUBSTANCE: method implies concreting and application of sheet reinforcement with tenons. Sheet reinforcement with tenons in unstressed condition, according to method, is immersed into concrete mix and held in it during two-three hours until complete cohesion of concrete mix with sheet reinforcement and tenons with possibility of creating conditions of preventing premature formation of cracks and also for imparting counterchipping, counterburglar and counterexplosion properties. EFFECT: higher efficiency. 4 dwg
Title | Year | Author | Number |
---|---|---|---|
PROTECTIVE BARRIER | 1995 |
|
RU2087643C1 |
VERTICAL STRUCTURAL MEMBER | 1992 |
|
RU2008411C1 |
METHOD AND PROCESS LINE FOR MANUFACTURING ESPECIALLY-HIGH-STRENGTH CEMENT CONCRETE | 1997 |
|
RU2106327C1 |
REINFORCEMENT ITEM FOR REINFORCED CONCRETE BOARD AND METHOD TO REINFORCE REINFORCED CONCRETE BOARD | 2011 |
|
RU2462564C1 |
LOW-PRESSURE REINFORCED CONCRETE PIPE AND ITS MANUFACTURING METHOD | 2020 |
|
RU2770507C2 |
REINFORCEMENT MEMBER | 0 |
|
SU1252457A1 |
REINFORCED CONCRETE CONTAINER FOR TRANSPORT AND/OR STORAGE OF SPENT NUCLEAR FUEL | 1998 |
|
RU2150755C1 |
METHOD TO RECOVER BEARING ABILITY OF DAMAGED REINFORCED CONCRETE PILLAR | 2010 |
|
RU2431728C1 |
REINFORCED-CONCRETE COLUMN REINFORCING METHOD | 2012 |
|
RU2494204C1 |
REINFORCED-CONCRETE CONTAINER FOR TRANSPORTATION AND/OR STORAGE OF SPENT NUCLEAR FUEL | 1999 |
|
RU2153715C1 |
Authors
Dates
1998-03-27—Published
1996-09-09—Filed