FIELD: construction engineering. SUBSTANCE: according to method, maintenance of moistened brickwork is effected by injecting paraffin which acts as barrier for liquid. Used as collecting vessel for liquid paraffin is heated reservoir operating on principle of sucking due to rarefaction. Owing to such kind of operation, liquid paraffin is not flowing out from blind holes made in brickwork for injecting paraffin. Due to simultaneous heating of paraffin in blind hole it is possible in addition to do away with preliminary drying of moistened brickwork. EFFECT: higher efficiency. 2 cl, 1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD, DEVICE AND COATING FOR WATERPROOFING OF BRICK WORK | 1995 |
|
RU2135716C1 |
METHOD AND COMPOUNDS FOR ANCHORING OF FASTENING MEMBERS IN DRILLED HOLES | 1992 |
|
RU2094559C1 |
DOWEL WITH SLEEVE HAVING DENTS | 1996 |
|
RU2153604C2 |
CONSTRUCTION DRY PLASTER MIXTURE FOR PROTECTION OF BRICKWORK AGAINST SALT CORROSION | 2024 |
|
RU2835651C1 |
DEVICE AND METHOD FOR AUTOMATIC RESEARCH OF BLOOD SAMPLES | 2005 |
|
RU2352939C2 |
METHOD OF CASTING OF SCREW PROPELLER FROM COPPER-BASE ALLOYS | 1996 |
|
RU2089342C1 |
OIL LEVEL INDICATOR FOR SCREW COMPRESSOR | 2011 |
|
RU2562693C2 |
FIREPLACE - TYPE PHYSIOTHERAPEUTIC DEVICE | 1992 |
|
RU2038540C1 |
METHOD OF WATERPROOFING POROUS BUILDING MATERIALS AND STRUCTURAL ELEMENTS | 1999 |
|
RU2213077C2 |
CONTAINER WITH TIGHT COVER | 1991 |
|
RU2065390C1 |
Authors
Dates
1998-04-27—Published
1994-09-02—Filed