FIELD: erection of underground structures. SUBSTANCE: method includes forming of supporting members in cut flanks, mounting of ceilings above cut and roof recultivation. Flanks of hollow or cut are reinforced with hollow retaining blocks and monorails installed in them to form bulkhead in form of wedge with its top downward. Installed in wedge top are hollow blocks along cut axis to form longitudinal main line. Bulkhead is made of combined blocks to form raising main line with monorails and alternating them with hollow functional magazines of blocks. Cut hollow is filled with structural functional blocks to establish thrusting force. In forming of steep or vertical bulkheads with hollow retaining blocks, the latter are made in form of hollow trapezium and installed by alternating their long and short bases towards cut ground mass and fastening the short bases with ground mass by anchors. EFFECT: higher economic efficiency of construction and provision of lasting stability of erected structure. 4 cl, 3 dwg
Title | Year | Author | Number |
---|---|---|---|
MULTISTORIED POWER-OPERATED MONORAIL GARAGE | 1996 |
|
RU2119030C1 |
METHOD FOR ERECTION OF UNDERGROUND STRUCTURES IN MINING MINERAL DEPOSITS | 0 |
|
SU1789707A1 |
METHOD OF COMPLEX DEVELOPMENT OF KIMBERLITIC PIPES | 2009 |
|
RU2386812C1 |
METHOD FOR IMPROVEMENT OF STABILITY OF OPENCAST FLANKS AND BENCHES | 0 |
|
SU1754899A1 |
METHOD FOR WORKING BENCH BY THIN HORIZONTAL LAYERS | 1996 |
|
RU2119056C1 |
COMBINED OPEN AND UNDERGROUND WORKING OF MINERAL DEPOSITS IN MOUNTAINS AND HILLS | 2014 |
|
RU2569122C1 |
METHOD OF TREATMENT OF TRANSITION ZONE AT OPEN-UNDEGROUND DEVELOPMENT OF MINERAL DEPOSITS | 2006 |
|
RU2360113C2 |
METHOD FOR COMBINED WORKING OF MINERAL DEPOSITS | 0 |
|
SU1754898A1 |
METHOD OF CONTROL OF METHANE EMISSION AT EXTRACTION DISTRICT IN CHAMBER-AND-PILLAR SYSTEM FOR BANK EXCAVATION | 2013 |
|
RU2533464C1 |
METHOD OF CREATING TECHNOGENIC DEPOSIT IN THE EARTH INTERIOR | 1998 |
|
RU2166087C2 |
Authors
Dates
1998-05-20—Published
1996-10-11—Filed