FIELD: driving of workings by blasting in gas-hazardous mines. SUBSTANCE: to form an additional free surface, the bore-hole is inertized by a blast of inertizing substance with tamping of an inhibitor, after that the charges of cut, main and mapping holes are blasted. EFFECT: facilitated procedure. 4 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF BLASTINGS BY BURN CUT | 1996 |
|
RU2110764C1 |
METHOD FOR DAMPING AIR SHOCK WAVES | 1992 |
|
RU2027018C1 |
METHOD OF DRILLING AND BLASTING OPERATIONS IN ROCK WORKINGS | 1997 |
|
RU2115088C1 |
METHOD OF BLASTING OPERATIONS IN GASSY MINES | 1996 |
|
RU2114389C1 |
METHOD OF INERT MEDIUM FORMATION | 1998 |
|
RU2147686C1 |
BULKHEAD | 1999 |
|
RU2165026C1 |
CHARGE OF IMPACT INITIATION | 1992 |
|
RU2039251C1 |
METHOD OF SUPPRESSING AIR SHOCK WAVE | 1995 |
|
RU2095577C1 |
EXPLOSIVE CHARGE OF IMPACT INITIATION | 1992 |
|
RU2005989C1 |
METHOD OF DRIVING PREPARATORY WORKING IN BEDS PREZENTING COAL AND GAS OUTBURST HAZARD | 0 |
|
SU791975A1 |
Authors
Dates
1998-05-20—Published
1996-11-15—Filed