FIELD: oil production. SUBSTANCE: in agreement with process grouting mortar is supplied to absorption zone over pouring pipes. Calculated volume of grouting mortar is delivered into absorption zone by portions. These portions alternate with portions of elastoviscous separator. After every portion of grouting mortar with separator it is left in quiescent state in zone close to shaft for time of loss of mobility. During this operation balance of pressures in well and stratum is provided. EFFECT: diminished material expenses, improved quality of isolation of absorption zones.
Title | Year | Author | Number |
---|---|---|---|
WELLS HIGH INTENSITY ABSORPTION INTERVALS INSULATION METHOD AND AERATED SLURRY FOR ITS EXECUTION | 2008 |
|
RU2379474C2 |
METHOD FOR ISOLATION OF WATER INFLOW IN OIL PRODUCING WELL | 1996 |
|
RU2114990C1 |
METHOD OF DEVELOPING OIL DEPOSIT IN CARBONATE RESERVOIRS OF FISSURED TYPE | 1996 |
|
RU2101474C1 |
METHOD FOR ISOLATION OF BRINE WATER IN FISSURED BEDS | 1996 |
|
RU2112875C1 |
METHOD OF ISOLATION OF LOST CIRCULATION FORMATIONS | 1990 |
|
RU2014433C1 |
INSTALLATION METHOD OF CEMENT BRIDGE IN WELL | 2011 |
|
RU2469178C1 |
METHOD FOR REVERSE CEMENTING OF CASING IN WELL | 1994 |
|
RU2067158C1 |
METHOD FOR SELECTIVE ISOLATION OF PRODUCTIVE RESERVOIR AT CEMENTATION OF PRODUCTION STRING | 1993 |
|
RU2087674C1 |
METHOD FOR DEVELOPMENT OF WATER-OIL BED | 1998 |
|
RU2146760C1 |
METHOD FOR SECONDARY OPENING OF PRODUCTIVE BED | 1996 |
|
RU2118445C1 |
Authors
Dates
1998-05-27—Published
1996-06-04—Filed