FIELD: power supply systems including those feeding ac and DC electrified railways and nontractive loads. SUBSTANCE: prefabricated module accommodating power and auxiliary pieces of equipment has three-layer shielding structure. Its external surface is made of corrosion-resistant material and internal one, of decorative material. Both surfaces of shielding structure are joined together by means of stiff heat-insulating ties. Space between them is filled with heat-insulating material, and all openings for letting external pipelines in and out are hermetically sealed. Module is mounted on rail, channel, or I- channel base and displaced over it by means of supporting and adjusting devices installed on its bottom surface and provided with supporting castors, vertical displacement controls and transverse displacement limiters that function to hold module in position on its base. EFFECT: improved reliability, facilitated maintenance and installation. 3 cl, 3 dwg
Title | Year | Author | Number |
---|---|---|---|
CONTACT SYSTEM SECTIONALIZING STATION (VERSIONS) | 1997 |
|
RU2139203C1 |
MODULAR METALCLAD TRANSFORMER SUBSTATION | 1996 |
|
RU2111595C1 |
TRACTION SUBSTATION | 1996 |
|
RU2111594C1 |
TRACTION SUBSTATION | 2003 |
|
RU2260232C2 |
FACTORY-ASSEMBLED TRANSFORMER SUBSTATION | 2000 |
|
RU2189681C1 |
METHOD FOR CONCRETING OF MONOLITHIC STRUCTURES WITH DIFFERENT-MASS COMPONENTS | 1998 |
|
RU2143047C1 |
TWO ENVIRONMENTAL-FRIENDLY DRILLING RIG IN ARCTIC DESIGN | 2018 |
|
RU2693981C1 |
HEAT-INSULATING AND FENCING STRUCTURES FOR SKELETON- TYPE BUILDING AND METHOD FOR THEIR MANUFACTURE | 1998 |
|
RU2157441C2 |
SHUTTERING PANEL | 1998 |
|
RU2149243C1 |
METHOD OF CONSTRUCTION OF SUBSTRUCTURE FOR CLUSTER DRILLING AND OPERATION OF WELLS OF OIL-GAS FIELDS IN FLOODED ZONES | 2001 |
|
RU2215089C2 |
Authors
Dates
1998-07-10—Published
1997-04-18—Filed