FIELD: oil and gas production.
SUBSTANCE: procedure for tightness recovery in flow string of well consists in successive pumping liquid glass and water solution of calcium chloride into isolation zone. Further, there is performed grout torqueing. First, there is pumped fringe of fresh water. Liquid glass and water solution of calcium chloride are pumped with fringes starting from fringe of water solution of calcium chloride. Buffer fringe of fresh water is pumped between each fringe. Water solution of calcium chloride has density 1.30-1.38 g/cm3. Volume ratio between water solution of calcium chloride and liquid glass in fringes is set from 1: 1 to 1: 3. Amount of fringes of water solution of calcium chloride and liquid glass is set not less, than 2. Fringes of water solution of calcium chloride and liquid glass are pressurised with process fluid of 1.00-1.18 g/cm3 density. The well is flushed with process fluid of 1.00-1.18 g/cm3 density and there is performed process conditioning during 2-4 hours. Buffer fringe of fresh water is pumped prior to grout pumping. Upon grout pumping grout is pressurised with process fluid of 1.00-1.18 g/cm3 density, the well is flushed with process fluid of 1.00-1.18 g/cm3 density and process conditioning is carried out for 24-28 hours.
EFFECT: increased reliability of tightness recovery procedure.
1 ex
Title | Year | Author | Number |
---|---|---|---|
ISOLATION METHOD OF WATER INFLUX TO WELL | 2010 |
|
RU2425957C1 |
METHOD FOR RESTORING TIGHTNESS OF PRODUCTION STRINGS | 1997 |
|
RU2116432C1 |
ISOLATION METHOD OF WATER INFLUX ZONES IN WELL | 2012 |
|
RU2494229C1 |
METHOD TO INCREASE WELL PRODUCTIVITY | 2012 |
|
RU2492317C1 |
WATER INFLOW ZONES CEMENTING METHOD | 2013 |
|
RU2533997C1 |
METHOD OF REPAIR-INSULATION WORKS IN OIL AND GAS WELL | 2019 |
|
RU2723416C1 |
ISOLATION METHOD OF WELL TROUBLESOME ZONE WITH CARBONATE BASINS | 2012 |
|
RU2494224C1 |
LIMITATION OF WELL WATER PRODUCTION | 2013 |
|
RU2525079C1 |
METHOD OF REPAIR AND INSULATION OPERATIONS IN A WELL | 2016 |
|
RU2618539C1 |
METHOD OF SHUTOFF OF WATER AND GAS INFLOWS TO WELLS | 2001 |
|
RU2206712C2 |
Authors
Dates
2011-02-20—Published
2010-04-15—Filed