FIELD: oil and gas production.
SUBSTANCE: mineral binding - liquid glass and curing liquid are pumped into leakage zone of flow string. Further, binding is after-cured with cement grout. Also, oil for replacement of water is pumped into the well first. Further, there is pumped solution of liquid glass with curing liquid - fluor-silicate sodium at the following ratio of components %: liquid glass (Na2SiO3) 88-86 %, fluor-silicate sodium (Na2SiF6)12-14 %.
EFFECT: raised reliability of isolation in stopping leakage of casing in interval of well above pay zone.
1 tbl
Title | Year | Author | Number |
---|---|---|---|
METHOD OF SEALING RECOVERY OF PRODUCTION STRING | 2010 |
|
RU2455458C1 |
METHOD FOR RESTORING TIGHTNESS OF PRODUCTION STRINGS | 1997 |
|
RU2116432C1 |
METHOD TO RECOVER TIGHTNESS OF PRODUCTION COLUMN | 2011 |
|
RU2463436C1 |
PROCEDURE FOR RECOVERY OF TIGHTNESS IN FLOW STRING OF WELL | 2010 |
|
RU2412333C1 |
METHOD OF REPAIR-INSULATION WORKS IN OIL AND GAS WELL | 2019 |
|
RU2723416C1 |
WELL REPAIR METHOD | 2012 |
|
RU2498045C1 |
COMPOSITION FOR REPAIR AND WATER-SHUTOFF OPERATIONS IN OIL AND GAS WELLS | 2003 |
|
RU2242606C1 |
RECOVERY METHOD OF WATER-PRODUCING OIL-AND-GAS WELL IN CONDITIONS OF ABNORMALLY LOW FORMATION PRESSURES | 2009 |
|
RU2410529C1 |
BOTTOM WATER ISOLATION METHOD | 2013 |
|
RU2569941C2 |
METHOD OF RECOVERY OF YIELD AND BRINGING TO OPERATION OF TEMPORARILY SHUT-IN WELLS WITH COMPLICATED STRUCTURE OF COLLECTORS UNDER CONDITIONS OF ABNORMALLY LOW BED PRESSURE AND HEAVY WATERING | 2008 |
|
RU2370636C1 |
Authors
Dates
2011-04-10—Published
2009-11-23—Filed