FIELD: oil and gas production. SUBSTANCE: invention is designed for application when collecting and treating crude oil. Distribution device is placed next to the wall of settler at the level of oil-water phase boundary. Using energy of jets of emulsion fed into settler, motion of liquid in settler is obtained such as to coincide with direction of the discontinuous phase motion. Water is bled at constant interphase level. Velocity of discontinuous phase is thus increased by the liquid velocity value of in middle part of settler, which results in several times increased rate of settling. EFFECT: increased settler productivity and improved settling quality. 1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF SEDIMENTATION | 1996 |
|
RU2104737C1 |
TANK FOR PRELIMINARY WATER DISCHARGE | 1999 |
|
RU2145512C1 |
METHOD OF PREPARING OIL-SLIME | 1999 |
|
RU2148035C1 |
METHOD OF DEHYDRATING CRUDE OIL | 1996 |
|
RU2095119C1 |
TUBULAR SETTLER-SEPARATOR | 1995 |
|
RU2089259C1 |
OIL CLEANING PLANT | 1997 |
|
RU2118198C1 |
TUBULAR SETTLER SEPARATOR | 1998 |
|
RU2133132C1 |
DEVICE FOR CONTROL OF LEVEL OF PETROLEUM-WATER INTERFACE IN SETTLERS | 1997 |
|
RU2128077C1 |
METHOD OF DESTROYING INTERMEDIATE EMULSION LAYER | 1999 |
|
RU2154089C1 |
SETTLER | 2005 |
|
RU2296607C2 |
Authors
Dates
1998-08-10—Published
1997-07-31—Filed