FIELD: gas- turbine plants burning natural gas. SUBSTANCE: system has combustion chamber communicating through gas ejector with gas line. Active nozzle of ejector is connected to high-pressure steam line. Ejector outlet is connected to condenser-aftercooler incorporating gas and water outlets; the latter communicates through water flow dispenser with combustion chamber. Fuel supply system is provided in addition with at least one more ejector and one more condenser-aftercooler installed in tandem upstream of main ejector. Active nozzle of additional ejector is connected to high- pressure steam line. Gas outlet of additional condenser-aftercooler is connected to inlet of ejector mounted downstream of it. EFFECT: reduced energy loss and cost. 2 cl, 1 dwg
Title | Year | Author | Number |
---|---|---|---|
COMBINED STEAM-GAS PLANT WITH COAL PLASMATHERMAL GASIFICATION | 1995 |
|
RU2105040C1 |
GAS-TURBINE PLANT | 1995 |
|
RU2095600C1 |
TECHNOLOGICAL POWER PLANT FOR THERMAL PROCESSING OF SOLID WASTE | 1998 |
|
RU2137981C1 |
GAS-TURBINE PLANT POWER STABILIZING DEVICE | 1995 |
|
RU2126902C1 |
STEAM-AND-GAS PLANT | 1995 |
|
RU2078229C1 |
STEAM-AND-GAS PLANT | 1995 |
|
RU2078230C1 |
GAS TURBINE PLANT | 1995 |
|
RU2168041C2 |
COMBINED-CYCLE PLANT | 1995 |
|
RU2100619C1 |
LUBRICATING SYSTEM OF GAS-TURBINE ENGINE | 1995 |
|
RU2117794C1 |
POWER-AND-CATALYST COGENERATION PLANT | 1996 |
|
RU2120466C1 |
Authors
Dates
1998-08-20—Published
1995-03-16—Filed