FIELD: construction engineering. SUBSTANCE: this particularly relates to consolidation of bases for foundations of buildings and structures by way of compaction. Deep compaction of any kind of dispersing ground is performed by method which implies sinking of injector into ground, delivery of solution under pressure through this injector, measuring and recording of solution indices, formation of zone of compacted ground, and subsequent sinking of injector with formation of adjacent zones of compacted ground. Compaction of ground is achieved due to injection of compacting and penetrating solution which ensures destruction of ground structure in zones of its loosening with preliminary compaction of ground over perimeter of compaction zone using same method. Application of aforesaid method upgrades compaction results. EFFECT: higher efficiency. 4 cl, 2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR FROZEN GROUND CONSOLIDATION IN THAWED ZONE | 2004 |
|
RU2275468C2 |
SOFT GROUND CONSOLIDATION METHOD | 2004 |
|
RU2278210C2 |
METHOD AND DEVICE FOR MOULDING OF CAST-IN- PLACE PILE IN GROUND | 1997 |
|
RU2150549C1 |
METHOD TO COMPACT COHESIVE DISPERSED SOILS | 2010 |
|
RU2425923C1 |
FOUNDATION PREPARATION METHOD | 2008 |
|
RU2380482C1 |
METHOF FOR ELIMINATION OF EMPTINESS IN POST-COVERED SPACE OF RAILROAD TUNNEL (VERSIONS) | 2006 |
|
RU2342491C2 |
METHOD TO STRENGTHEN FOUNDATION BASES IN SEISMICALLY DANGEROUS AREAS | 2011 |
|
RU2487976C1 |
METHOD OF PREVENTING TAPPING SLAB FOUNDATION BUILDING UNDER A COLUMN AT ADDITIONAL LOAD | 2018 |
|
RU2692217C1 |
METHOD TO COMPACT SOIL AND DEVICE FOR ITS REALISATION | 2012 |
|
RU2535564C2 |
METHOD TO CORRECT IRREGULARITIES OF BUILDINGS AND STRUCTURES SUBSIDENCE ON SLAB FOUNDATION | 2011 |
|
RU2468152C1 |
Authors
Dates
1998-09-20—Published
1997-01-27—Filed