FIELD: building, particularly to consolidate frozen ground in thawed zone under building foundation.
SUBSTANCE: method involves driving injector in ground; injecting consolidation penetrative mix under pressure, which provides ground structure in weakened ground zones and ground compaction along compacted zone perimeter; following injector driving to create compacted zones adjacent above zones. The consolidation penetrative mix is cooled salt solution comprising filler of material having lesser heat conductivity in comparison with ground to be compacted.
EFFECT: extended field of method application, increased reliability and efficiency.
5 cl, 1 ex, 1 dwg
Title | Year | Author | Number |
---|---|---|---|
SOFT GROUND CONSOLIDATION METHOD | 2004 |
|
RU2278210C2 |
GROUND COMPACTION METHOD | 1997 |
|
RU2119009C1 |
METHOD FOR INCREASING THE CARRYING CAPACITY OF AERODROME COATINGS IN THE CONDITIONS OF SALINE PERMAFROST SOILS | 2021 |
|
RU2763640C1 |
METHOD TO STRENGTHEN FOUNDATION BASES IN SEISMICALLY DANGEROUS AREAS | 2011 |
|
RU2487976C1 |
METHOD OF INCREASING BEARING STRENGTH OF PILING | 2007 |
|
RU2379419C2 |
METHOD TO CORRECT IRREGULARITIES OF BUILDINGS AND STRUCTURES SUBSIDENCE ON SLAB FOUNDATION | 2011 |
|
RU2468152C1 |
METHOD OF BUILDING OF PILE FOUNDATION AND PILE FOUNDATION | 2007 |
|
RU2348759C2 |
DRILLING-AND-DRIVING METHOD FOR PILE FOUNDATION ERECTION IN PERMAFROST GROUND | 2006 |
|
RU2320821C1 |
METHOD OF CONSTRUCTION AND INSTALLATION OF PILES IN PERMAFROST ZONES USING HEAT STABILIZATION COUPLINGS | 2023 |
|
RU2818341C1 |
METHOD FOR LOCAL DEFROSTING OF PERMAFROST GROUND | 2003 |
|
RU2236507C1 |
Authors
Dates
2006-04-27—Published
2004-03-30—Filed