FIELD: construction.
SUBSTANCE: invention relates to strengthening of the lower part of the section of the railroad tunnel and may be employed for strengthening of bases of buildings and constructions. Method includes feeding of mortar with filling agents. A shaft is drilled in the lower part of the section of the railroad tunnel above the detected emptiness for feeding of filling material and a second shaft for feeding of consolidating mortar. Feeding device is installed and filling material is supplied through it in the form of balls of waterproof material, density whereof equals or is greater than water density. Balls are compressed by means of a vibrations generator; entrained water is pressed out from the emptiness by balls either through holes in the rock or through the consolidating mortar feeding shaft. Having filled the emptiness with balls, feeding device is taken away and the shaft is sealed, consolidating mortar is supplied into the second shaft and having filled all the emptiness the shaft is sealed. Should there be no water in the emptiness one shaft is drilled in the lower part of the section of the railroad tunnel; where through emptiness are filled with balls compressed by a vibration generator, after that feeding device is taken away and consolidating mortar is supplied through the shaft. Emptiness been filled the shaft is sealed.
EFFECT: cost reduction of elimination of emptiness.
2 cl, 1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF PROTECTION OF KARST OCCURRENCE | 2013 |
|
RU2543162C1 |
ERECTION OF TUNNELS IN STRUCTURALLY UNSTABLE SOILS WITH KARST PHENOMENA AND/OR BOIL PROCESSES | 2013 |
|
RU2537711C1 |
SHAFT LINING, COMPLEX FOR ITS ERECTION AND METHOD OF ITS ERECTION | 2012 |
|
RU2502873C1 |
METHOD FOR DEPTH COMPENSATION COMPACTION OF SOIL | 2009 |
|
RU2405890C1 |
METHOD OF TUNNEL RAILWAY BASE REPAIR | 2007 |
|
RU2334839C1 |
METHOD TO RESTORE DEFORMED STORM WATER SEWER, COLLECTORS OF SMALL RIVERS IN URBAN AREA | 2013 |
|
RU2560764C2 |
METHOD FOR CONSTRUCTING DRILLED PILE IN PERMAFROST SOIL | 2023 |
|
RU2803751C1 |
METHOD TO ERECT UNDERGROUND MINE WITH SHIELD TUNNELLING | 2011 |
|
RU2476675C2 |
METHOD OF CONSTRUCTING PASSAGES IN DEEP LEVEL UNDERGROUND RAILWAY PYLON STATIONS | 2018 |
|
RU2691420C1 |
METHOD OF FIXING AND ENHANCING THE CARRYING CAPACITY OF WET FINE GRAIN SOILS OF RUNNING TYPE UNDER BASES AND FOUNDATIONS OF BUILDINGS AND STRUCTURES | 2015 |
|
RU2594495C1 |
Authors
Dates
2008-12-27—Published
2006-12-13—Filed