FIELD: opencast mineral mining; may be used in recultivation of sidehill quarries. SUBSTANCE: method consists in layer filling of quarry zone to form hydraulic accumulating hollow, further planing of fill surface, coating of fill surface with fertile earth layer and subsequent sowing to grass. Hydraulic accumulating hollow is arranged in fill lower layer whose thickness is equal to thickness of water-bearing layer and connected with water collector for water raising. Upper layer is filled with antifriction rocks. Flow of surface water from quarrying zone is ensured by planing of fill surface. EFFECT: higher efficiency. 2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD AND DEVICE FOR DUMPING | 1996 |
|
RU2117156C1 |
METHOD OF RECULTIVATION IN STRIP MINING OF MINERAL DEPOSITS | 0 |
|
SU1078070A1 |
METHOD FOR PREVENTING FILTERING FROM TAILING POOL | 1994 |
|
RU2068048C1 |
METHOD OF DUMPING OVERBURDEN ROCK UNDER FLOODING CONDITIONS | 0 |
|
SU1113546A1 |
METHOD OF RECLAMATION OF LOW-PRODUCTIVITY LAND | 0 |
|
SU1658852A1 |
EQUIPMENT SET FOR FILLING OF HIGH DUMPS WITH USE OF AUTOMOBILE TRANSPORT | 2000 |
|
RU2168021C1 |
INJECTOR LOOSENER | 1998 |
|
RU2134748C1 |
METHOD FOR DEVELOPMENT OF MINERAL PLACER DEPOSITS BY COMBINED APPLICATION OF PRESSURE AND PRESSURELESS WATER STREAMS | 1997 |
|
RU2132952C1 |
RESTORING THE SURFACE AREAS OF ABANDONED OPEN PITS AND CAVING-IN ZONES | 0 |
|
SU945434A1 |
METHOD FOR RECLAMATION OF DISTURBED LAND PLOTS WITH THE USE OF SOIL FOR RECLAMATION | 2017 |
|
RU2654074C1 |
Authors
Dates
1998-10-20—Published
1995-05-25—Filed