FIELD: mining; applicable in opencast mining for filling of deep ravines and opencasts with use of automobile transport. SUBSTANCE: equipment set includes transfer point for dump trucks, transportation means to spreader with pulling winch and spreader. Transportation means is made in the form of car with bucket dumping over its front edge means of hinge securing of bucket to front part of car. Mounted on bucket rear part are rollers on whose axles U-shaped carrier is fastened. U-shaped carrier is connected with load rope by double-drum pulling winch installed on transfer point for dump trucks. Idle rope is attached to bucket rear wall and is connected to idle drum of pulling winch via block secured to car. Spreader is made in the form of self-propelled tipper with worm drive supports and frame with curved guides on which bucket rollers rest when bucket moves and tips inside frame. Secured to front edge of said frame is end block round which load rope runs from load drum of pulling winch to U-shaped bucket carrier. Share with hydraulic cylinders is mounted on front end of frame for levelling rock. Hydraulic cylinders change position of share with respect to self-propelled tipper. EFFECT: simplified design of equipment set and increased total capacity of dump due to periodic transition of transfer point for dump trucks in direction of advancing of dumping front of works in filling of overburden rocks into deep ravines and opencasts. 2 cl, 13 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF OPENCAST MINING OF MINERAL DEPOSITS AND EXCAVATOR-HOPPER TRANSFER POINT FOR METHOD EMBODIMENT | 2001 |
|
RU2204720C2 |
METHOD OF CONTROL OVER CAVING OF ROCKS | 0 |
|
SU1812311A1 |
METHOD AND DEVICE FOR DUMPING | 1996 |
|
RU2117156C1 |
METHOD FOR OPEN-PIT MINING OF STEEPLY DIPPING MINERAL DEPOSITS | 1989 |
|
RU2013550C1 |
METHOD OF PREPARATION OF NEW HAULAGE LEVEL AND EXCAVATOR-RAILWAY COMPLEX FOR METHOD EMBODIMENT | 2000 |
|
RU2186982C1 |
METHOD OF OPEN DEVELOPMENT OF DEPOSITS OF SOLID MINERAL RESOURCES | 2014 |
|
RU2558051C1 |
PILLING OF DIFFERENT-HARDNESS ROCKS IN HIGH-CAPACITY GREAT-HEIGHT DUMP WITH APPLICATION OF MOBILE DISCHARGE BOOM | 2013 |
|
RU2571111C2 |
METHOD FOR OPEN DEVELOPMENT OF STEEPLY-DIPPING DEPOSITS OF ROUND SHAPE WITH INTERNAL DUMPING | 2018 |
|
RU2685590C1 |
METHOD FOR FORMING DUMPS WITH SEPARATION OF ENRICHED FINE FRACTION | 2023 |
|
RU2809406C1 |
METHOD OF DUMP FORMATION | 0 |
|
SU1033739A1 |
Authors
Dates
2001-05-27—Published
2000-03-03—Filed