FIELD: construction.
SUBSTANCE: invention relates to construction in northern areas and is intended for construction of ice engineering structures, cold accumulation and formation of arched ice structures for storage of (not) floating ice platforms on sea shelf plates. It contains sawdust or any other type of wood pulp, before pykrete freezing on inflatable structures are coated with geomaterial in the form of water-permeable geosynthetic material: geosynthetic net or grid.
EFFECT: technical result is improvement of reliability of ice structure, which is achieved by the fact that in the method of erection of ice structure, which involves development of platform, whereat inflatable design with their further dismantling and movement as and when necessary, their filling with air, layer-by-layer pykrete freezing on by spraying or by layer-by-layer irrigation of water pulp.
1 cl, 3 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR CONSTRUCTION OF REINFORCED ICE CROSSINGS | 2021 |
|
RU2790293C1 |
METHOD FOR CONSTRUCTION OF ICE STRUCTURES | 1997 |
|
RU2121037C1 |
METHOD FOR ERECTION OF ICE PLATFORM ON GROUND | 1995 |
|
RU2080440C1 |
METHOD OF PRODUCING LARGE MASSES OF ICE ON WATER SURFACE AND DEVICE FOR ITS IMPLEMENTATION | 2016 |
|
RU2723530C2 |
METHOD FOR ERECTION OF ICE STRUCTURES | 1994 |
|
RU2094570C1 |
METHOD OF ERECTING ICE STRUCTURES | 0 |
|
SU1124097A1 |
METHOD FOR ERECTION OF OBJECTS | 2008 |
|
RU2360826C1 |
ICE MOORING CONSTRUCTION METHOD IN ARCTIC CONDITIONS | 2019 |
|
RU2715034C1 |
0 |
|
SU1778233A1 | |
METHOD FOR CONSTRUCTION AND OPERATION OF SURFACE STORAGE FACILITY FOR SOLID TOXIC WASTE IN PERMAFROST ZONE | 2023 |
|
RU2806888C1 |
Authors
Dates
2016-10-10—Published
2015-07-06—Filed