FIELD: oil and gas production. SUBSTANCE: method includes pumping into formation cement grouting mortar which fills crack and, when hardened to form cement stone, creates reliable insulation. Pumping is conducted under pressure corresponding to that at which replacing agent is forced. EFFECT: increased reliability of insulation in bottom zone of wells. 2 cl
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR ISOLATION OF WATER INFLOW IN WELL | 1994 |
|
RU2071548C1 |
METHOD OF WATER INFLUX SHUTOFF AND REGULATION OF FORMATION PERMEABILITY | 1996 |
|
RU2163965C2 |
METHOD OF FORMATION ISOLATION WITH CEMENT-SILICATE MUD | 2012 |
|
RU2519262C1 |
LIMITATION OF WELL WATER PRODUCTION | 2016 |
|
RU2634467C1 |
METHOD FOR DEVELOPING OIL DEPOSIT | 1993 |
|
RU2065031C1 |
PROCESS OF DEVELOPMENT OF OIL FIELD AT LATE STAGE OF ITS OPERATION | 1999 |
|
RU2183260C2 |
METHOD FOR DEVELOPMENT OF OIL DEPOSIT | 1995 |
|
RU2085714C1 |
METHOD OF MASSIVE OIL POOL DEVELOPMENT | 2001 |
|
RU2213853C2 |
METHOD OF TREATMENT OF BOTTOMHOLE FORMATION ZONE | 2014 |
|
RU2566344C1 |
PROCEDURE FOR INSULATION OF WATER INFLOWING PAY IN WELL AND HEAT INSULATING PIPE FOR ITS IMPLEMENTATION | 2008 |
|
RU2435020C2 |
Authors
Dates
1998-11-20—Published
1995-01-05—Filed