FIELD: pyrometallurgical equipment. SUBSTANCE: this pyrometallurgical aggregate includes gas-lifting chamber with blasting devices and loading chamber separated by interchamber partition and fixtures for release of melting products and gas conduit. Separation chamber is located between gas-lifting and loading chambers in side wall of rear part of aggregate. Inlet window of separation chamber is arranged in wall separating gas-lifting and separation chambers above upper edge of interchamber partition. Window for release of gases out of aggregate is located in wall of separation chamber below inlet window of separation chamber. Aggregate is provided with chamber for melting and metered feed of extracted phase and siphon for its removal. EFFECT: design of multipurpose pyrometallurgical aggregate for melting of ore materials and semifinished products and for impoverishment of slags, diminished capital outlays. 1 cl, 3 dwg
Title | Year | Author | Number |
---|---|---|---|
FURNACE | 1995 |
|
RU2087820C1 |
METHOD OF MELTING MATERIALS IN MOLTEN-METAL BATH AND FURNACE FOR REALIZATION OF THIS METHOD | 1998 |
|
RU2152436C2 |
FURNACE FOR PROCESSING MATERIALS IN LIQUID BATH | 1998 |
|
RU2140615C1 |
UNIT FOR CONTINUOUS IMPOVERISHMENT OF MELTED SLAG | 1992 |
|
RU2068533C1 |
METHOD AND FURNACE FOR PROCESSING RADIOACTIVE METAL WASTES | 1998 |
|
RU2148865C1 |
FURNACE | 1993 |
|
RU2044210C1 |
FURNACE | 1993 |
|
RU2061938C1 |
COMPLEX FOR REWORKING SOLID DOMESTIC AND INDUSTRIAL WASTES | 1997 |
|
RU2122155C1 |
INSTALLATION FOR ENERGY-PROCESSING OF ORES AND SOLID FUEL | 1991 |
|
RU2007464C1 |
FURNACE FOR CONTINUOUS PROCESSING CHARGE MATERIALS | 0 |
|
SU1801194A3 |
Authors
Dates
1998-12-20—Published
1997-12-16—Filed