FIELD: road building; construction of main pipeline. SUBSTANCE: motor road has pavement, road embankment made of mineral ground and side interlayers of nonwoven synthetic material laid on base. Outer edge of each interlayer is placed on part of corresponding slope of embankment and is driven into embankment body. Road is made with underslope trenches of rectangular section, depth not less than ice bed thickness and width not less than season melted ground bed thickness, and is provided with two continuous cutoff walls arranged in trenches. Each cutoff wall is made up of set of containers of equal thickness filled with mineral ground with height equal to depth of trench. EFFECT: enhanced reliability of road. 3 cl, 2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF TRANSPORTATION OF GAS BY PIPE LINE LAID IN PERMAFROST | 1996 |
|
RU2128799C1 |
MOTOR ROAD ON PERMAFROST SOIL | 2002 |
|
RU2221102C1 |
METHOD FOR PHASED COMPLEX ENGINEERING PROTECTION OF GENERAL PLANNING EMBANKMENT | 2008 |
|
RU2390605C1 |
EARTHWORK ON PERMAFROST SOILS AND METHOD OF ITS ERECTION WITH BASE REINFORCEMENT IN AREAS OF PERMAFROST PROPAGATION | 2010 |
|
RU2443828C1 |
METHOD FOR DRIVING A GAS MAIN IN MAN-MADE TRENCH AT PERMAFROST SOIL TERRITORY (VARIANTS) AND DEVICE FOR REALIZATION OF METHOD (VARIANTS) | 2006 |
|
RU2303736C1 |
MOTOR ROAD ON PERMAFROST SOILS | 2014 |
|
RU2551174C1 |
AUTOMOBILE ROAD ON PERMAFROST | 2015 |
|
RU2580549C1 |
ROAD EMBANKMENT BUILT ON PERMAFROST GROUND | 2004 |
|
RU2256032C1 |
WATER DRAINAGE DITCH | 2003 |
|
RU2245957C1 |
GROOVE FOR ROAD BUILDING | 2003 |
|
RU2244781C1 |
Authors
Dates
1999-03-27—Published
1996-06-27—Filed