FIELD: construction.
SUBSTANCE: invention relates to construction and can be used for reconstruction and overhaul of motor roads on permafrost soils. Automobile road on permafrost soils under condition of non-uniformity of soils along the width of the base includes a roadbed and geo-synthetic material. In slope part of the roadbed on the side of the base with layers of frozen soil there is formed a thrust soil roll of mineral frost-free soil edged by reinforcing geo-synthetic material arranged in the underslope part of the motor road base and a part of the road bed slope in the form of a semi-collar in solid ice-soil mass formed as a result of action of heat stabilizers, submersed to the mark of permanently frozen soil super-face for fixing of reinforcing geo-synthetic material with pitch dependant on thermo-physical properties of bottom soil.
EFFECT: technical result consists in improvement of roadbed stability, reduction of vertical and horizontal deformations of the topping and bottom soil.
1 cl, 1 dwg
Title | Year | Author | Number |
---|---|---|---|
MOTOR ROAD ON PERMAFROST SOILS | 2014 |
|
RU2551174C1 |
STRUCTURE FOR STABILISATION OF ROAD BED AND ACTIVE LAYER OF OPERATED MOTOR ROAD | 2015 |
|
RU2575952C1 |
MOTOR ROAD | 2016 |
|
RU2616301C1 |
MOTOR ROAD AT PERMAFROST GROUNDS | 2019 |
|
RU2732774C1 |
ROAD STRUCTURE ON WEAK BASE FOR ROADS | 2015 |
|
RU2585302C1 |
EARTHWORK ON SWAMPS WITH SUPPORT GROUND CARTRIDGE OF WIDENED TYPE | 2015 |
|
RU2594379C1 |
ROAD EMBANKMENT ON PERMAFROST IN AREAS WITH SNOW TRANPORT | 2020 |
|
RU2756148C1 |
METHOD FOR CONSTRUCTING SUBGRADE OF ADDITIONAL TRACK ON WEAK BASE IN CASE OF THAWING | 2021 |
|
RU2795020C1 |
EARTHWORK ON PERMAFROST SOILS AND METHOD OF ITS ERECTION WITH BASE REINFORCEMENT IN AREAS OF PERMAFROST PROPAGATION | 2010 |
|
RU2443828C1 |
ROAD EMBANKMENT ON PERMAFROST | 2018 |
|
RU2705656C1 |
Authors
Dates
2016-04-10—Published
2015-02-25—Filed