FIELD: mining industry. SUBSTANCE: according to method, bore-holes are drilled in roof during driving of workings. Load-bearing ceiling is formed, and anchors are secured in it. Bore-holes are drilled in roof rock with advancement of cut face by two runs. Drilled from them at side of working are inclined bore-holes with their extension beyond contour of pressing-out and dangerous deformations of rock mass in sides to value equal to 0.25-0.3 width of working. After that, solution of hardening mixture is injected into bore-holes, and load-bearing ceiling is formed over width of underground working with protrusion of ends of load-bearing ceiling beyond contour of pressing-out and dangerous deformations in sides to values equal to 0.25-0.3 of underground working width. Application of aforesaid method allows for reduction of supporting cost together with increasing stability of underground workings. EFFECT: higher efficiency. 3 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF MINE WORKING BOLTING | 1999 |
|
RU2160837C2 |
METHOD FOR SUPPORTING JUNCTIONS OF UNDERGROUND WORKINGS | 1996 |
|
RU2116454C1 |
METHOD FOR RECONDITIONING AND SUPPORTING OF WORKINGS CAVED WITH ENCLOSING ROCKS | 1990 |
|
RU2005882C1 |
METHOD FOR SUPPORTING SOIL OF MINE WORKINGS | 2011 |
|
RU2459907C1 |
METHOD OF SUPPORTING MINE WORKINGS IN ADJACENT COAL SEAMS | 1999 |
|
RU2167301C1 |
METHOD FOR REINFORCEMENT OF MINES SOIL | 2011 |
|
RU2468207C1 |
METHOD FOR SUPPORTING MINE WORKINGS WITH THERMAL STRENGTHENING OF UNSTABLE ROCKS | 2009 |
|
RU2405938C1 |
MANNER OF FASTENING OF DEVELOPMENT DRIFT BY MEANS OF BOLTING | 2008 |
|
RU2368786C1 |
REINFORCEMENT METHOD OF MINE WORKINGS WITH ANCHOR SUPPORT | 2010 |
|
RU2430237C1 |
METHOD FOR REINFORCEMENT OF MINES | 2009 |
|
RU2400631C1 |
Authors
Dates
1999-04-10—Published
1997-04-21—Filed